Heavy Construction — Walthall, Mississippi

WD MS20260071-15670-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Walthall, Mississippi (construction type: heavy) is $16.54/hr base + $0.00/hr fringe = $16.54/hr total package (WD MS20260071-15670-hvy, Rev. 2).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: MS20260071-15670-hvy
Revision: 2
Construction Type: heavy
State: Mississippi (MS)
County: Walthall
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference MS20260071View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $16.54 $0.00 $16.54 -25% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES $14.98 $0.00 $14.98 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.30 $11.63 $44.93 +63% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $18.50 $0.00 $18.50 -2% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $21.00 $8.81 $29.81 Bottom 10% +57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES $12.01 $4.70 $16.71 Top 10% -7% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES $13.09 $0.00 $13.09 -27% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES $20.16 $1.93 $22.09 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.66 $0.00 $16.66 $0.00 $0.00 $0.00 $0.00
OPERATOR: WINCH $20.08 $0.00 $20.08 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES $13.25 $0.00 $13.25 Above median -46% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Walthall, MS — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Walthall

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260071-15670-hvy →