Heavy Construction — Tate, Mississippi
WD MS20260062-15637-hvy · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Tate, Mississippi (construction type: heavy) is $16.45/hr base + $0.00/hr fringe = $16.45/hr total package (WD MS20260062-15637-hvy, Rev. 2).
Scroll down for all 11 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $16.45 | $0.00 | $16.45 -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $15.36 | $0.00 | $15.36 -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $32.90 | $11.10 | $44.00 +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $20.63 | $0.00 | $20.63 +9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $19.00 | $0.00 | $19.00 +0% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | $14.29 | $0.00 | $14.29 Above median -20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | $12.75 | $0.00 | $12.75 -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.63 | $1.37 | $18.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $18.85 | $1.18 | $20.03 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $22.41 | $4.66 | $27.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | $16.03 | $0.95 | $16.98 Top 10% -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Tate, MS — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Tate
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Tate, Mississippi.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.