Heavy Construction — Tate, Mississippi

WD MS20260062-15637-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Tate, Mississippi (construction type: heavy) is $16.45/hr base + $0.00/hr fringe = $16.45/hr total package (WD MS20260062-15637-hvy, Rev. 2).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: MS20260062-15637-hvy
Revision: 2
Construction Type: heavy
State: Mississippi (MS)
County: Tate
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference MS20260062View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $16.45 $0.00 $16.45 -26% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.36 $0.00 $15.36 -28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $32.90 $11.10 $44.00 +60% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $20.63 $0.00 $20.63 +9% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $19.00 $0.00 $19.00 +0% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES $14.29 $0.00 $14.29 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES $12.75 $0.00 $12.75 -29% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.63 $1.37 $18.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $18.85 $1.18 $20.03 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $22.41 $4.66 $27.07 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES $16.03 $0.95 $16.98 Top 10% -30% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Tate, MS — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Tate

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260062-15637-hvy →