Davis-Bacon Wage Determinations — Tate, Mississippi

Tate has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Tate, Mississippi cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: MS20260054-15637-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: MS20260062-15637-hvy Rev. 2
Effective: May 17, 2026
View trade rates →
highway Active
WD: MS20260142-15637-hwy Rev. 1
Effective: May 17, 2026
View trade rates →
residential Active
WD: MS20260036-15637-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Tate

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 SHEET METAL WORKER building $34.95 $18.22 $53.17 WD →
2 POWER EQUIPMENT OPERATOR: FORKLIFT building $35.50 $14.55 $50.05 WD →
3 POWER EQUIPMENT OPERATOR Forklift building $35.50 $14.55 $50.05 WD →
4 POWER EQUIPMENT OPERATOR: CRANE building $35.50 $14.55 $50.05 WD →
5 POWER EQUIPMENT OPERATOR Crane building $35.50 $14.55 $50.05 WD →
6 IRONWORKER, REINFORCING building $31.00 $17.77 $48.77 WD →
7 ELECTRICIAN heavy $32.90 $11.10 $44.00 WD →
8 PIPEFITTER building $30.41 $11.47 $41.88 WD →
9 OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE building $31.50 $4.25 $35.75 WD →
10 OPERATOR: Backhoe/Excavator/Trackhoe building $31.50 $4.25 $35.75 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →