Highway Construction — Simpson, Mississippi
WD MS20260141-15668-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER in Simpson, Mississippi (construction type: highway) is $13.28/hr base + $0.00/hr fringe = $13.28/hr total package (WD MS20260141-15668-hwy, Rev. 1).
Scroll down for all 39 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $13.28 | $0.00 | $13.28 -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $13.99 | $0.00 | $13.99 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $24.04 | $5.87 | $29.91 +9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER | $12.05 | $0.00 | $12.05 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| INSTALLER - GUARDRAIL | $12.07 | $0.00 | $12.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| INSTALLER - SIGN | $11.99 | $0.00 | $11.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $15.47 | $0.00 | $15.47 -18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING, SPREADING; AND GRADE CHECKING | $11.50 | $0.00 | $11.50 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: FLAGGER | $10.22 | $0.00 | $10.22 -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $10.23 | $0.00 | $10.23 Bottom 10% -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LUTEMAN | $12.88 | $0.00 | $12.88 Above median -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.27 | $0.00 | $11.27 -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $13.44 | $0.00 | $13.44 -25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ASPHALT SPREADER | $14.71 | $0.00 | $14.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.97 | $0.00 | $14.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $11.64 | $0.00 | $11.64 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $11.10 | $0.00 | $11.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $14.25 | $0.00 | $14.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CONCRETE SAW | $15.50 | $0.00 | $15.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $19.22 | $0.00 | $19.22 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DISTRIBUTOR | $10.95 | $0.00 | $10.95 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $14.41 | $0.00 | $14.41 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRINDING/GROOVING MACHINE | $15.90 | $0.00 | $15.90 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $13.28 | $0.00 | $13.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $16.81 | $0.00 | $16.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MILLING MACHINE | $14.68 | $0.00 | $14.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MIXER | $14.25 | $0.00 | $14.25 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: OILER | $12.35 | $0.00 | $12.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $11.74 | $0.00 | $11.74 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $11.54 | $0.00 | $11.54 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCRAPER | $12.25 | $0.00 | $12.25 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $11.22 | $0.00 | $11.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC SIGNALIZATION | $30.35 | $11.39 | $41.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $11.77 | $0.00 | $11.77 Bottom 10% -52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLATBED TRUCK | $14.06 | $0.00 | $14.06 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.08 | $0.00 | $12.08 Bottom 10% -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: MECHANIC | $13.00 | $0.00 | $13.00 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: SEMI/TRAILER TRUCK | $14.60 | $0.00 | $14.60 -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $10.00 | $0.00 | $10.00 Bottom 10% -59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Simpson, MS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Simpson
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Simpson, Mississippi.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.