Building Construction — Simpson, Mississippi

WD MS20260055-15668-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK..$ 18.60 1.97 BRICKLAYER in Simpson, Mississippi (construction type: building) is $20.29/hr base + $0.00/hr fringe = $20.29/hr total package (WD MS20260055-15668-bld, Rev. 1).

Scroll down for all 17 trade classifications covered by this determination.

WD Number: MS20260055-15668-bld
Revision: 1
Construction Type: building
State: Mississippi (MS)
County: Simpson
Effective: May 17, 2026
Trades covered: 17
Official source: SAM.gov reference MS20260055View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK..$ 18.60 1.97 BRICKLAYER $20.29 $0.00 $20.29 -9% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.92 $0.00 $16.92 -21% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.64 $2.80 $22.44 -19% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $31.00 $17.77 $48.77 Above median +158% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $17.39 $0.00 $17.39 -8% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.61 $1.88 $13.49 Above median -25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $16.00 $1.28 $17.28 Above median -3% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $31.50 $4.25 $35.75 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.14 $1.03 $16.17 $0.00 $0.00 $0.00 $0.00
PAINTER $16.00 $0.00 $16.00 -18% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $30.41 $11.47 $41.88 +50% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $19.78 $2.14 $21.92 -21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $35.50 $14.55 $50.05 +126% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $35.50 $14.55 $50.05 +126% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 18.00 0.35 ROOFER $16.93 $0.00 $16.93 -28% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $18.00 $0.00 $18.00 -16% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.47 $0.41 $14.88 -39% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Simpson, MS — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Simpson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260055-15668-bld →