Highway Construction — Harrison, Mississippi

WD MS20260133-15687-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Harrison, Mississippi (construction type: highway) is $14.43/hr base + $0.00/hr fringe = $14.43/hr total package (WD MS20260133-15687-hwy, Rev. 1).

Scroll down for all 39 trade classifications covered by this determination.

WD Number: MS20260133-15687-hwy
Revision: 1
Construction Type: highway
State: Mississippi (MS)
County: Harrison
Effective: May 17, 2026
Trades covered: 39
Official source: SAM.gov reference MS20260133View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $14.43 $0.00 $14.43 -35% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.25 $0.00 $15.25 -29% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $25.57 $6.79 $32.36 +17% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $14.75 $0.00 $14.75 Above median $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $13.41 $0.00 $13.41 Above median $0.00 $0.00 $0.00 $0.00
INSTALLER: GUARDRAIL $11.78 $0.00 $11.78 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $17.33 $0.00 $17.33 -8% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $12.27 $0.00 $12.27 -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.00 $0.00 $11.00 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $11.16 $0.00 $11.16 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $15.63 $0.00 $15.63 -13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $13.19 $0.00 $13.19 Top 10% -26% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $12.00 $0.00 $12.00 -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LUTEMAN $12.88 $0.00 $12.88 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.14 $0.00 $13.14 -27% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $15.00 $0.00 $15.00 -16% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $14.83 $0.00 $14.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $15.62 $0.00 $15.62 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $11.86 $0.00 $11.86 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $14.25 $0.00 $14.25 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.47 $0.00 $15.47 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $14.96 $3.27 $18.23 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $15.89 $0.00 $15.89 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $13.87 $0.00 $13.87 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $16.44 $0.00 $16.44 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $14.38 $0.00 $14.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $19.33 $0.00 $19.33 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $15.44 $0.00 $15.44 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $12.22 $0.00 $12.22 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $15.81 $0.00 $15.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.23 $0.00 $14.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $14.00 $0.00 $14.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $12.29 $0.00 $12.29 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.32 $0.00 $14.32 -41% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $14.72 $0.00 $14.72 -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $11.00 $0.00 $11.00 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MECHANIC $12.31 $0.00 $12.31 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $14.36 $0.00 $14.36 -41% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $17.08 $0.00 $17.08 Above median -30% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Harrison, MS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.