Highway Construction — Harrison, Mississippi
WD MS20260133-15687-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER in Harrison, Mississippi (construction type: highway) is $14.43/hr base + $0.00/hr fringe = $14.43/hr total package (WD MS20260133-15687-hwy, Rev. 1).
Scroll down for all 39 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $14.43 | $0.00 | $14.43 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $15.25 | $0.00 | $15.25 -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $25.57 | $6.79 | $32.36 +17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER | $14.75 | $0.00 | $14.75 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| INSTALLER - SIGN | $13.41 | $0.00 | $13.41 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| INSTALLER: GUARDRAIL | $11.78 | $0.00 | $11.78 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $17.33 | $0.00 | $17.33 -8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $12.27 | $0.00 | $12.27 -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.00 | $0.00 | $11.00 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: FLAGGER | $11.16 | $0.00 | $11.16 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GRADE CHECKER | $15.63 | $0.00 | $15.63 -13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $13.19 | $0.00 | $13.19 Top 10% -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $12.00 | $0.00 | $12.00 -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LUTEMAN | $12.88 | $0.00 | $12.88 Above median -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.14 | $0.00 | $13.14 -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $15.00 | $0.00 | $15.00 -16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ASPHALT SPREADER | $14.83 | $0.00 | $14.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $15.62 | $0.00 | $15.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $11.86 | $0.00 | $11.86 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $14.25 | $0.00 | $14.25 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $15.47 | $0.00 | $15.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CONCRETE SAW | $14.96 | $3.27 | $18.23 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $15.89 | $0.00 | $15.89 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DISTRIBUTOR | $13.87 | $0.00 | $13.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $16.44 | $0.00 | $16.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $14.38 | $0.00 | $14.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $19.33 | $0.00 | $19.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MILLING MACHINE | $15.44 | $0.00 | $15.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: OILER | $12.22 | $0.00 | $12.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $15.81 | $0.00 | $15.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $14.23 | $0.00 | $14.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCRAPER | $14.00 | $0.00 | $14.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $12.29 | $0.00 | $12.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $14.32 | $0.00 | $14.32 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLATBED TRUCK | $14.72 | $0.00 | $14.72 -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $11.00 | $0.00 | $11.00 Bottom 10% -55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: MECHANIC | $12.31 | $0.00 | $12.31 Bottom 10% -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: SEMI/TRAILER TRUCK | $14.36 | $0.00 | $14.36 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $17.08 | $0.00 | $17.08 Above median -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Harrison, MS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Harrison
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Harrison, Mississippi.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.