Building Construction — Harrison, Mississippi

WD MS20260050-15687-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Harrison, Mississippi (construction type: building) is $22.00/hr base + $0.02/hr fringe = $22.02/hr total package (WD MS20260050-15687-bld, Rev. 2).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: MS20260050-15687-bld
Revision: 2
Construction Type: building
State: Mississippi (MS)
County: Harrison
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference MS20260050View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $22.00 $0.02 $22.02 -7% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING, FINISHING/TAPING AND FORM WORK $15.90 $0.00 $15.90 -28% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.37 $0.00 $18.37 -14% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $32.90 $11.10 $44.00 +60% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $31.00 $17.77 $48.77 Above median +158% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $18.51 $0.00 $18.51 -2% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.91 $0.00 $10.91 -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $12.50 $0.00 $12.50 -30% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.93 $1.62 $19.55 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.14 $1.03 $16.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $21.40 $3.58 $24.98 $0.00 $0.00 $0.00 $0.00
PAINTER $17.00 $0.00 $17.00 -13% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER (INCLUDES HVAC UNIT INSTALLATION) $30.41 $11.47 $41.88 +50% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER (INCLUDES HVAC PIPE INSTALLATION) $29.91 $11.97 $41.88 +50% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $35.50 $14.55 $50.05 +126% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $14.50 $0.00 $14.50 -25% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $30.45 $13.88 $44.33 +88% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $21.21 $0.00 $21.21 Bottom 10% -24% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $18.00 $0.00 $18.00 -16% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.11 $0.27 $14.38 -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Harrison, MS — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Harrison

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260050-15687-bld →