Highway Construction — Forrest, Mississippi

WD MS20260131-15676-hwy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Forrest, Mississippi (construction type: highway) is $12.00/hr base + $0.00/hr fringe = $12.00/hr total package (WD MS20260131-15676-hwy, Rev. 2).

Scroll down for all 38 trade classifications covered by this determination.

WD Number: MS20260131-15676-hwy
Revision: 2
Construction Type: highway
State: Mississippi (MS)
County: Forrest
Effective: May 17, 2026
Trades covered: 38
Official source: SAM.gov reference MS20260131View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $12.00 $0.00 $12.00 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $11.54 $1.63 $13.17 -38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $32.90 $11.10 $44.00 +60% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $14.55 $0.00 $14.55 $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $12.19 $0.00 $12.19 $0.00 $0.00 $0.00 $0.00
INSTALLER: GUARDRAIL $12.39 $0.00 $12.39 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $16.44 $0.00 $16.44 -13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING, SPREADING $10.34 $0.00 $10.34 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $11.42 $0.00 $11.42 -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $14.82 $0.00 $14.82 -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $12.17 $0.00 $12.17 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LUTEMAN $12.88 $0.00 $12.88 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.57 $0.00 $10.57 -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.50 $0.00 $14.50 -19% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $14.71 $0.00 $14.71 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $14.20 $0.00 $14.20 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $11.86 $0.00 $11.86 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $10.94 $0.00 $10.94 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $13.99 $0.00 $13.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $13.93 $0.00 $13.93 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $14.80 $0.00 $14.80 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $11.46 $0.00 $11.46 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $16.09 $0.00 $16.09 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.99 $0.00 $13.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $13.00 $0.00 $13.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $16.96 $0.00 $16.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $12.22 $0.00 $12.22 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $11.56 $0.00 $11.56 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $12.17 $0.00 $12.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $14.00 $0.00 $14.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
SURVEYOR $11.56 $0.00 $11.56 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.58 $0.00 $11.58 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $14.72 $0.00 $14.72 -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $14.18 $0.00 $14.18 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MECHANIC $12.31 $0.00 $12.31 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $14.36 $0.00 $14.36 -41% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $17.08 $0.00 $17.08 Above median -30% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Forrest, MS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.