Building Construction — Forrest, Mississippi

WD MS20260048-15676-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Forrest, Mississippi (construction type: building) is $20.29/hr base + $0.00/hr fringe = $20.29/hr total package (WD MS20260048-15676-bld, Rev. 2).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: MS20260048-15676-bld
Revision: 2
Construction Type: building
State: Mississippi (MS)
County: Forrest
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference MS20260048View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $20.29 $0.00 $20.29 -14% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $17.84 $6.04 $23.88 +8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.31 $0.00 $18.31 -14% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $32.90 $11.10 $44.00 +60% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $31.00 $17.77 $48.77 Above median +158% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $18.05 $0.00 $18.05 -5% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.53 $0.00 $12.53 -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $12.50 $0.00 $12.50 -30% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.53 $0.00 $17.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.14 $1.03 $16.17 $0.00 $0.00 $0.00 $0.00
PAINTER $17.00 $0.00 $17.00 -13% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $30.41 $11.47 $41.88 +50% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $29.91 $11.97 $41.88 +50% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $35.50 $14.55 $50.05 +126% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $35.50 $14.55 $50.05 +126% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $14.50 $0.00 $14.50 -25% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $30.45 $13.88 $44.33 +88% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $18.00 $0.00 $18.00 -16% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.11 $0.27 $14.38 -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Forrest, MS — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Forrest

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260048-15676-bld →