Residential Construction — Wright, Minnesota

WD MN20260023-15561-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Wright, Minnesota (construction type: residential) is $40.63/hr base + $28.42/hr fringe = $69.05/hr total package (WD MN20260023-15561-res, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: MN20260023-15561-res
Revision: 1
Construction Type: residential
State: Minnesota (MN)
County: Wright
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference MN20260023View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $40.63 $28.42 $69.05 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $53.91 $36.48 $90.39 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $59.00 $35.79 $94.79 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $46.35 $36.86 $83.21 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
LABOR DAY $48.32 $25.54 $73.86 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 COMMON OR GENERAL LABORER $32.41 $17.44 $49.85 +77% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 MASON TENDER, PIPELAYER $32.91 $17.44 $50.35 +78% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $11.50 $0.00 $11.50 -59% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE $34.85 $15.95 $50.80 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 3 DRAGLINE $33.44 $15.95 $49.39 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE $33.10 $15.95 $49.05 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 $32.93 $15.95 $48.88 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE $31.42 $15.95 $47.37 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 8 OILER $28.29 $15.95 $44.24 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $31.89 $17.41 $49.30 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $31.45 $17.85 $49.30 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER FOOTNOTE: PAID HOLIDAY: LABOR DAY $59.54 $33.26 $92.80 +132% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER FOOTNOTE: PAID HOLIDAY: LABOR DAY $50.23 $37.52 $87.75 +119% vs market $0.00 $0.00 $0.00 $0.00
ROOFER (ISANTI COUNTY, WRIGHT) $42.93 $22.87 $65.80 +76% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER FOOTNOTE: PAID HOLIDAY - LABOR DAY $45.01 $26.53 $71.54 +138% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Wright, MN — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Wright

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260023-15561-res →