Building Construction — Wright, Minnesota
WD MN20260112-15561-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ARTICULATED HAULER in Wright, Minnesota (construction type: building) is $46.51/hr base + $26.90/hr fringe = $73.41/hr total package (WD MN20260112-15561-bld, Rev. 1).
Scroll down for all 58 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ARTICULATED HAULER | $46.51 | $26.90 | $73.41 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS ABATEMENT WORKER | $41.23 | $25.99 | $67.22 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BLASTER | $34.26 | $18.54 | $52.80 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $48.35 | $31.93 | $80.28 Above median +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOOM TRUCK | $46.51 | $26.90 | $73.41 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $48.23 | $26.53 | $74.76 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $45.54 | $29.34 | $74.88 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPET LAYER | $45.25 | $26.98 | $72.23 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON | $48.21 | $24.97 | $73.18 Above median +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER | $46.51 | $26.90 | $73.41 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL TAPER | $41.72 | $29.72 | $71.44 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $56.00 | $34.39 | $90.39 Top 10% +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR CONSTRUCTORS | $62.52 | $45.36 | $107.88 Top 10% +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FLAG PERSON | $43.39 | $24.74 | $68.13 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $36.49 | $21.85 | $58.34 Above median +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HEATING AND FROST INSULATORS | $53.19 | $31.95 | $85.14 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $44.85 | $35.72 | $80.57 Above median +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $43.39 | $24.24 | $67.63 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $30.04 | $21.53 | $51.57 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: SKILLED | $43.39 | $24.24 | $67.63 Above median +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICLLY SEEDING, SODDING, OR PLANT, AND TWO-FRAM | $30.04 | $21.53 | $51.57 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| LATHER | $47.00 | $26.85 | $73.85 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET | $50.64 | $26.90 | $77.54 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $41.66 | $35.40 | $77.06 Above median +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $44.00 | $27.69 | $71.69 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS.) | $22.50 | $0.00 | $22.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $45.71 | $29.73 | $75.44 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER/STEAMFITTER | $53.48 | $36.96 | $90.44 Top 10% +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPELAYER | $45.13 | $24.74 | $69.87 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $47.93 | $25.34 | $73.27 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $56.73 | $31.52 | $88.25 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INC | $51.03 | $26.90 | $77.93 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE | $49.05 | $26.90 | $75.95 Top 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE | $48.68 | $26.90 | $75.58 Top 10% +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE | $44.82 | $26.90 | $71.72 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER | $41.28 | $26.90 | $68.18 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED | $45.61 | $26.90 | $72.51 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O | $45.01 | $26.90 | $71.91 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN | $41.36 | $26.90 | $68.26 Top 10% +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S | $40.02 | $26.40 | $66.42 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR | $43.55 | $26.90 | $70.45 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $41.06 | $22.68 | $63.74 Above median +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $53.71 | $34.57 | $88.28 Top 10% +194% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SIGN ERECTOR | $34.69 | $19.88 | $54.57 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $43.53 | $26.67 | $70.20 +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SURVEY FIELD TECHNICIAN | $43.39 | $24.74 | $68.13 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER | $46.27 | $26.64 | $72.91 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $35.15 | $24.36 | $59.51 Top 10% +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $42.76 | $30.32 | $73.08 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL PERSON | $41.66 | $23.74 | $65.40 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER | $33.00 | $8.75 | $41.75 +42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK | $33.00 | $8.75 | $41.75 +42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS | $25.00 | $6.91 | $31.91 +9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS | $23.00 | $6.76 | $29.76 +1% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL MINER | $38.50 | $22.39 | $60.89 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| UNDERGROUND AND OPEN DITCH LABORER | $43.13 | $24.74 | $67.87 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WIRING SYSTEM TECHNICIAN | $47.73 | $22.24 | $69.97 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WIRING SYSTEMS INSTALLER | $33.44 | $17.82 | $51.26 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Wright, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Wright
Compliance Notes
- This wage determination applies to federal contracts for building construction in Wright, Minnesota.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.