Residential Construction — Washington, Minnesota

WD MN20260020-15560-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER (ANOKA, CARVER, DAKOTA, RAMSEY, SCOTT, SHERBURNE, WASHINGTON) in Washington, Minnesota (construction type: residential) is $40.63/hr base + $28.42/hr fringe = $69.05/hr total package (WD MN20260020-15560-res, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: MN20260020-15560-res
Revision: 1
Construction Type: residential
State: Minnesota (MN)
County: Washington
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference MN20260020View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER (ANOKA, CARVER, DAKOTA, RAMSEY, SCOTT, SHERBURNE, WASHINGTON) $40.63 $28.42 $69.05 +122% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER (SHERBURNE) $40.63 $28.42 $69.05 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER (SHERBURNE) $36.71 $20.17 $56.88 Bottom 10% +83% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ANOKA, DAKOTA, RAMSEY, SHERBURNE, AND WASHINGTON COUNTIES) $53.91 $36.48 $90.39 +131% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ELECTRICAL CONTRACTS $5 MILLION AND OVER: (SHERBURNE) $44.12 $22.57 $66.69 +70% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ELECTRICAL CONTRACTS UNDER $5 MILLION: (SHERBURNE) $43.67 $22.35 $66.02 +69% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $46.35 $36.86 $83.21 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 COMMON OR GENERAL LABORER, ASPHALT RAKER, MASON TENDER, PLASTER TENDER, TOP PERSON $32.41 $17.44 $49.85 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 COMMON OR GENERAL LABORER, ASPHALT RAKER, MASON TENDER, PLASTER TENDER, TOP PERSON $28.46 $15.82 $44.28 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 BOTTOM PERSON, MASON TENDER, PIPELAYER $32.91 $17.44 $50.35 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 BOTTOM PERSON, MASON TENDER, PIPELAYER $28.96 $15.82 $44.78 Above median +59% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $11.50 $0.00 $11.50 -59% vs market $0.00 $0.00 $0.00 $0.00
MISSISSIPPI RIVER)) $59.00 $35.79 $94.79 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE $34.85 $15.95 $50.80 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 3 DRAGLINE $33.44 $15.95 $49.39 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE $33.10 $15.95 $49.05 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 $32.93 $15.95 $48.88 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE $31.42 $15.95 $47.37 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 7 SELF PROPELLED VIBRATING PACKER $30.30 $15.95 $46.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 8 OILER $28.29 $15.95 $44.24 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $31.89 $17.41 $49.30 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $31.45 $17.85 $49.30 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY (SHERBURNE) $31.45 $17.85 $49.30 +68% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY. PROJECTS UNDER $8,000: RECEIVE 80% OF BASIC HOURLY RATE $24.91 $13.31 $38.22 +31% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $51.70 $42.45 $94.15 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER (ANOKA, CARVER, SCOTT, SHERBURNE) $48.33 $40.46 $88.79 +122% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER (SHERBURNE COUNTY) $48.33 $40.46 $88.79 +122% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER (ANOKA, CARVER, SCOTT & SHERBURNE) FOOTNOTE: PAID HOLIDAY: LABOR DAY $59.54 $33.26 $92.80 +132% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER (SHERBURNE) FOOTNOTE: PAID HOLIDAY: LABOR DAY $53.16 $32.21 $85.37 +113% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER. FOOTNOTE: PAID HOLIDAY: LABOR DAY $50.23 $37.52 $87.75 +119% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $39.01 $21.99 $61.00 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.60 $25.14 $60.74 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER FOOTNOTE: PAID HOLIDAY: LABOR DAY $45.01 $26.53 $71.54 +138% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Washington, MN — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Washington

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260020-15560-res →