Heavy Construction — Washington, Minnesota

WD MN20260239-15560-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Washington, Minnesota (construction type: heavy) is $44.67/hr base + $26.90/hr fringe = $71.57/hr total package (WD MN20260239-15560-hvy, Rev. 1).

Scroll down for all 42 trade classifications covered by this determination.

WD Number: MN20260239-15560-hvy
Revision: 1
Construction Type: heavy
State: Minnesota (MN)
County: Washington
Effective: May 17, 2026
Trades covered: 42
Official source: SAM.gov reference MN20260239View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $44.67 $26.90 $71.57 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $39.86 $24.11 $63.97 Above median $0.00 $0.00 $0.00 $0.00
BLASTER $22.08 $6.87 $28.95 Above median $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.35 $31.93 $80.28 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $47.25 $26.90 $74.15 Top 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $48.23 $26.53 $74.76 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $49.82 $29.92 $79.74 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $51.23 $26.22 $77.45 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
CRAWLER, HYDRAULIC BACKHOE AND/OR OTHER SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS THREE CUBIC YARDS AND OVER MANUFACTURER.S RATED CAPACITY INCLUDING $45.61 $26.90 $72.51 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $60.40 $34.39 $94.79 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $44.00 $26.12 $70.12 Top 10% $0.00 $0.00 $0.00 $0.00
GROUND PERSON $37.77 $20.38 $58.15 Top 10% $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $47.10 $24.40 $71.50 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.85 $35.72 $80.57 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $44.00 $26.12 $70.12 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $30.04 $21.16 $51.20 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $44.00 $26.12 $70.12 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRA $30.04 $21.16 $51.20 Top 10% $0.00 $0.00 $0.00 $0.00
LINEMAN $50.86 $23.57 $74.43 Top 10% +48% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $43.44 $33.37 $76.81 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
OFF-ROAD TRUCK $44.67 $26.90 $71.57 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $45.50 $27.69 $73.19 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS) $38.90 $23.49 $62.39 Top 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVER $49.46 $30.23 $79.69 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $55.94 $34.50 $90.44 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $47.50 $26.12 $73.62 Top 10% $0.00 $0.00 $0.00 $0.00
PLUMBER $61.28 $31.52 $92.80 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER, STATIONARY PLANT; DERRICK; DRAGLINE, C $45.01 $26.90 $71.91 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; CONCRETE BATCH PLANT OPERATOR; BIT $44.67 $26.90 $71.57 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; CONVEYOR; DREDGE DECK HAND $41.36 $26.90 $68.26 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $57.96 $34.57 $92.53 Top 10% +208% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $44.00 $26.12 $70.12 Top 10% $0.00 $0.00 $0.00 $0.00
TILE SETTER $34.76 $23.29 $58.05 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $44.00 $26.12 $70.12 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $41.35 $24.70 $66.05 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $34.70 $21.75 $56.45 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $34.60 $21.76 $56.36 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $37.54 $21.76 $59.30 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
TUNNEL MINER $45.50 $26.12 $71.62 Top 10% $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $45.50 $26.12 $71.62 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $47.73 $22.24 $69.97 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $33.44 $17.82 $51.26 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Washington, MN — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Washington

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260239-15560-hvy →