Building Construction — Pipestone, Minnesota

WD MN20260085-15595-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS ABATEMENT WORKER in Pipestone, Minnesota (construction type: building) is $41.23/hr base + $25.99/hr fringe = $67.22/hr total package (WD MN20260085-15595-bld, Rev. 1).

Scroll down for all 51 trade classifications covered by this determination.

WD Number: MN20260085-15595-bld
Revision: 1
Construction Type: building
State: Minnesota (MN)
County: Pipestone
Effective: May 17, 2026
Trades covered: 51
Official source: SAM.gov reference MN20260085View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS ABATEMENT WORKER $41.23 $25.99 $67.22 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $11.13 $0.44 $11.57 Bottom 10% -77% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.75 $21.17 $53.92 +26% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $33.14 $27.60 $60.74 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $28.55 $14.03 $42.58 +8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $26.00 $2.19 $28.19 Bottom 10% -8% vs market $0.00 $0.00 $0.00 $0.00
DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER $44.54 $26.40 $70.94 $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER $35.71 $25.04 $60.75 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.00 $6.34 $44.34 +13% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTORS $62.52 $45.36 $107.88 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $13.50 $3.82 $17.32 $0.00 $0.00 $0.00 $0.00
GLAZIER $37.74 $12.96 $50.70 +57% vs market $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $57.24 $31.95 $89.19 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $46.00 $34.11 $80.11 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $32.97 $24.46 $57.43 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $17.50 $0.00 $17.50 Above median -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $32.97 $24.46 $57.43 Bottom 10% +103% vs market $0.00 $0.00 $0.00 $0.00
LATHER $19.25 $4.90 $24.15 Above median $0.00 $0.00 $0.00 $0.00
METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET $48.53 $26.88 $75.41 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $41.66 $35.40 $77.06 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $34.28 $24.83 $59.11 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS.) $15.00 $0.00 $15.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $41.00 $14.42 $55.42 +38% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $42.51 $26.01 $68.52 Above median $0.00 $0.00 $0.00 $0.00
PLASTERER $24.00 $2.81 $26.81 Bottom 10% -18% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $30.00 $9.72 $39.72 -1% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INC $48.89 $26.40 $75.29 +99% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE $47.02 $26.88 $73.90 +96% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE $22.66 $5.00 $27.66 Bottom 10% -27% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE $42.94 $26.40 $69.34 +84% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER $28.35 $13.40 $41.75 +11% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED $24.00 $10.00 $34.00 -10% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC $27.50 $3.50 $31.00 Bottom 10% -18% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O $27.90 $5.68 $33.58 -11% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN $25.90 $3.21 $29.11 -23% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S $20.00 $1.50 $21.50 -43% vs market $0.00 $0.00 $0.00 $0.00
PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR $41.73 $26.88 $68.61 $0.00 $0.00 $0.00 $0.00
ROOFER $39.01 $21.93 $60.94 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $30.00 $7.40 $37.40 +24% vs market $0.00 $0.00 $0.00 $0.00
SIGN ERECTOR $37.19 $19.88 $57.07 Top 10% $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $37.83 $18.20 $56.03 +40% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $11.13 $0.47 $11.60 Bottom 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER $43.73 $20.73 $64.46 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $11.13 $0.47 $11.60 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $20.00 $4.00 $24.00 Bottom 10% -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $20.25 $10.00 $30.25 +3% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $18.28 $5.00 $23.28 Bottom 10% -21% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $20.00 $1.50 $21.50 Bottom 10% -27% vs market $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $22.09 $14.90 $36.99 Bottom 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $44.61 $20.17 $64.78 $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $31.25 $15.83 $47.08 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Pipestone, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.