Davis-Bacon Wage Determinations — Pipestone, Minnesota

Pipestone has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Pipestone, Minnesota cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: MN20260085-15595-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: MN20260238-15595-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway Active
WD: MN20260238-15595-hwy Rev. 1
Effective: May 17, 2026
View trade rates →
residential Active
WD: MN20260010-15595-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Pipestone

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 ELEVATOR CONSTRUCTORS building $62.52 $45.36 $107.88 WD →
2 HEATING AND FROST INSULATORS building $57.24 $31.95 $89.19 WD →
3 PLUMBER heavy $54.79 $30.58 $85.37 WD →
4 BOILERMAKER heavy $48.35 $31.93 $80.28 WD →
5 IRONWORKER heavy $46.00 $34.11 $80.11 WD →
6 PILEDRIVER highway $49.46 $30.23 $79.69 WD →
7 Piledriver highway $49.46 $30.23 $79.69 WD →
8 MILLWRIGHT building $41.66 $35.40 $77.06 WD →
9 POWER EQUIPMENT OPERATOR building $48.53 $26.88 $75.41 WD →
10 METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET building $48.53 $26.88 $75.41 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →