Residential Construction — Benton, Minnesota

WD MN20260021-15565-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Benton, Minnesota (construction type: residential) is $43.86/hr base + $17.70/hr fringe = $61.56/hr total package (WD MN20260021-15565-res, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: MN20260021-15565-res
Revision: 1
Construction Type: residential
State: Minnesota (MN)
County: Benton
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference MN20260021View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $43.86 $17.70 $61.56 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $36.71 $20.17 $56.88 +83% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $52.00 $32.80 $84.80 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, ELECTRICAL CONTRACTS $5 MILLION AND OVER $50.45 $31.14 $81.59 +108% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, ELECTRICAL CONTRACTS UNDER $5 MILLION $50.00 $30.86 $80.86 +107% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $46.35 $36.86 $83.21 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.26 $2.81 $16.07 Above median -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $11.50 $0.00 $11.50 -59% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 MASON TENDER PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR $21.81 $14.97 $36.78 +30% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 PIPELAYER PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR $22.56 $14.97 $37.53 +33% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE $34.85 $15.95 $50.80 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE $33.10 $15.95 $49.05 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 $32.93 $15.95 $48.88 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE $31.42 $15.95 $47.37 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 8 OILER $28.29 $15.95 $44.24 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY. PROJECTS UNDER $8,000: RECEIVE 80% OF BASIC HOURLY RATE $24.91 $13.31 $38.22 +31% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER. FOOTNOTE: PAID HOLIDAY: LABOR DAY $53.16 $32.21 $85.37 +113% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $42.93 $22.87 $65.80 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.60 $25.14 $60.74 Above median +102% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Benton, MN — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Benton

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260021-15565-res →