Building Construction — Benton, Minnesota

WD MN20260031-15565-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Benton, Minnesota (construction type: building) is $46.51/hr base + $26.90/hr fringe = $73.41/hr total package (WD MN20260031-15565-bld, Rev. 1).

Scroll down for all 59 trade classifications covered by this determination.

WD Number: MN20260031-15565-bld
Revision: 1
Construction Type: building
State: Minnesota (MN)
County: Benton
Effective: May 17, 2026
Trades covered: 59
Official source: SAM.gov reference MN20260031View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $46.51 $26.90 $73.41 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $41.23 $25.99 $67.22 Top 10% $0.00 $0.00 $0.00 $0.00
BLASTER $27.36 $17.69 $45.05 Above median $0.00 $0.00 $0.00 $0.00
BLASTER $29.11 $17.69 $46.80 Above median $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.35 $31.93 $80.28 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $46.51 $26.90 $73.41 Above median $0.00 $0.00 $0.00 $0.00
BRICKLAYER $43.41 $28.50 $71.91 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $36.55 $29.03 $65.58 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $39.03 $25.43 $64.46 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $50.06 $25.45 $75.51 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER $46.51 $26.90 $73.41 Top 10% $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER $35.31 $24.43 $59.74 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.00 $23.10 $64.10 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTORS $62.52 $45.36 $107.88 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $37.66 $23.97 $61.63 Above median $0.00 $0.00 $0.00 $0.00
GLAZIER $36.49 $21.85 $58.34 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $57.24 $31.95 $89.19 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.85 $35.72 $80.57 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $37.66 $24.41 $62.07 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $31.66 $22.78 $54.44 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $37.66 $24.41 $62.07 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRA $26.89 $19.31 $46.20 $0.00 $0.00 $0.00 $0.00
LATHER $36.55 $26.85 $63.40 Above median $0.00 $0.00 $0.00 $0.00
METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET $50.64 $26.90 $77.54 Top 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $41.66 $35.40 $77.06 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
OFF-ROAD TRUCK $19.50 $3.00 $22.50 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER $34.23 $25.28 $59.51 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVER $41.14 $27.05 $68.19 $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $48.24 $34.70 $82.94 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $47.50 $26.12 $73.62 Top 10% $0.00 $0.00 $0.00 $0.00
PLASTERER $33.22 $18.33 $51.55 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $54.79 $30.58 $85.37 Above median +113% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INC $49.25 $25.20 $74.45 +97% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE $21.00 $2.50 $23.50 Bottom 10% -38% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE $48.68 $26.40 $75.08 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE $44.82 $26.90 $71.72 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER $16.10 $6.00 $22.10 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED $42.64 $26.87 $69.51 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC $42.14 $26.40 $68.54 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O $41.81 $26.87 $68.68 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN $38.99 $26.87 $65.86 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S $38.05 $26.40 $64.45 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR $43.55 $26.90 $70.45 Top 10% $0.00 $0.00 $0.00 $0.00
ROOFER $41.06 $22.68 $63.74 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $48.15 $29.12 $77.27 Above median +157% vs market $0.00 $0.00 $0.00 $0.00
SIGN ERECTOR $34.69 $19.88 $54.57 Above median $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $43.53 $26.67 $70.20 +75% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $34.13 $22.27 $56.40 Above median $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER $46.27 $26.64 $72.91 Top 10% $0.00 $0.00 $0.00 $0.00
TILE FINISHER $14.00 $0.00 $14.00 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $40.64 $12.47 $53.11 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $16.00 $6.00 $22.00 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $33.00 $5.43 $38.43 +31% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $27.40 $6.91 $34.31 +17% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $35.60 $24.55 $60.15 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $23.00 $6.76 $29.76 +1% vs market $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $45.50 $26.12 $71.62 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $47.73 $22.24 $69.97 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $33.44 $17.82 $51.26 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Benton, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Benton

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260031-15565-bld →