Residential Construction — Van Buren, Michigan

WD MI20260023-15499-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY in Van Buren, Michigan (construction type: residential) is $44.00/hr base + $25.25/hr fringe = $69.25/hr total package (WD MI20260023-15499-res, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: MI20260023-15499-res
Revision: 1
Construction Type: residential
State: Michigan (MI)
County: Van Buren
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference MI20260023View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $44.00 $25.25 $69.25 Above median $0.00 $0.00 $0.00 $0.00
1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $48.98 $25.25 $74.23 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $18.81 $6.38 $25.19 -15% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.27 $5.85 $25.12 -12% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $18.44 $3.51 $21.95 -37% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $36.55 $29.51 $66.06 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $16.87 $5.46 $22.33 Above median -5% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $9.64 $2.81 $12.45 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $27.21 $13.45 $40.66 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.95 $5.46 $23.41 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $19.94 $5.46 $25.40 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $17.66 $7.65 $25.31 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE O $45.68 $25.25 $70.93 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $21.75 $11.94 $33.69 +42% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $27.18 $21.05 $48.23 +30% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $24.71 $5.04 $29.75 -20% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $33.98 $18.51 $52.49 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $32.00 $10.73 $42.73 +44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.00 $5.71 $22.71 Above median -14% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Van Buren, MI — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Van Buren

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260023-15499-res →