Building Construction — Van Buren, Michigan

WD MI20260099-15499-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY in Van Buren, Michigan (construction type: building) is $41.28/hr base + $25.25/hr fringe = $66.53/hr total package (WD MI20260099-15499-bld, Rev. 1).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: MI20260099-15499-bld
Revision: 1
Construction Type: building
State: Michigan (MI)
County: Van Buren
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference MI20260099View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $41.28 $25.25 $66.53 Bottom 10% $0.00 $0.00 $0.00 $0.00
1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $47.28 $25.25 $72.53 Above median $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.00 $23.65 $63.65 Above median +190% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $36.74 $80.24 Above median +151% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $35.21 $24.26 $59.47 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $28.29 $21.42 $49.71 +68% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $24.63 $12.88 $37.51 Above median +32% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $22.31 $12.83 $35.14 Above median +24% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.78 $21.84 $64.62 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $18.48 $7.93 $26.41 -14% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $29.51 $66.06 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $29.51 $66.06 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER $27.21 $13.45 $40.66 +74% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $10.38 $0.50 $10.88 Above median -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $20.29 $7.22 $27.51 Above median +18% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $40.04 $26.47 $66.51 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $19.68 $6.64 $26.32 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE O $43.93 $25.25 $69.18 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.5 $39.57 $25.25 $64.82 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE $39.57 $25.25 $64.82 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE $33.71 $25.25 $58.96 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE $31.23 $25.25 $56.48 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $19.10 $8.48 $27.58 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $27.07 $16.46 $43.53 +83% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $27.32 $16.72 $44.04 +86% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $27.07 $16.56 $43.63 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION $32.50 $24.97 $57.47 Above median +55% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $32.50 $24.97 $57.47 Above median +55% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $33.98 $18.51 $52.49 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $42.74 $21.53 $64.27 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $24.56 $7.20 $31.76 Above median +7% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $41.34 $27.39 $68.73 +86% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $26.24 $21.13 $47.37 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $27.35 $22.20 $49.55 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $17.26 $11.42 $28.68 Top 10% +8% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $14.50 $0.44 $14.94 -44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $13.57 $1.18 $14.75 Above median -44% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Van Buren, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Van Buren

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260099-15499-bld →