Residential Construction — Monroe, Michigan

WD MI20260017-15465-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Monroe, Michigan (construction type: residential) is $29.19/hr base + $15.76/hr fringe = $44.95/hr total package (WD MI20260017-15465-res, Rev. 1).

Scroll down for all 23 trade classifications covered by this determination.

WD Number: MI20260017-15465-res
Revision: 1
Construction Type: residential
State: Michigan (MI)
County: Monroe
Effective: May 17, 2026
Trades covered: 23
Official source: SAM.gov reference MI20260017View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $29.19 $15.76 $44.95 +52% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $31.58 $16.27 $47.85 +62% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.27 $5.85 $25.12 -12% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $30.31 $13.18 $43.49 +24% vs market $0.00 $0.00 $0.00 $0.00
HOUR ADDITIONAL $46.31 $25.35 $71.66 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $35.49 $29.20 $64.69 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
LABORER $38.80 $15.70 $54.50 Above median +133% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $38.58 $15.70 $54.28 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.99 $5.46 $23.45 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPE LABORER: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER $27.71 $9.10 $36.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $51.29 $25.35 $76.64 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $49.79 $25.35 $75.14 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $48.29 $25.35 $73.64 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $47.99 $25.35 $73.34 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $47.17 $25.35 $72.52 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR; BOBCAT/SKID LOADER; BULLDOZER; GRADER/BLADE; SCRAPER; LOADER FOOTNOTES: TOWER CRANES: TO BE PAID $45.34 $25.35 $70.69 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $20.14 $14.72 $34.86 +47% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $31.37 $14.91 $46.28 +25% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $31.37 $14.91 $46.28 Above median +25% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $30.73 $26.82 $57.55 Above median +113% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $17.21 $9.99 $27.20 Bottom 10% -8% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.00 $5.71 $22.71 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: PICKUP PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE $31.03 $0.70 $31.73 +20% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Monroe, MI — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Monroe

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260017-15465-res →