Building Construction — Monroe, Michigan

WD MI20260092-15465-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Monroe, Michigan (construction type: building) is $37.00/hr base + $23.85/hr fringe = $60.85/hr total package (WD MI20260092-15465-bld, Rev. 1).

Scroll down for all 35 trade classifications covered by this determination.

WD Number: MI20260092-15465-bld
Revision: 1
Construction Type: building
State: Michigan (MI)
County: Monroe
Effective: May 17, 2026
Trades covered: 35
Official source: SAM.gov reference MI20260092View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $37.00 $23.85 $60.85 Above median +177% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $37.64 $81.14 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $41.66 $26.53 $68.19 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $42.44 $31.43 $73.87 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $30.63 $14.07 $44.70 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING $48.40 $17.79 $66.19 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER PAID HOLIDAYS: NEW YEAR'S DAY, DECORATION DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS W $42.00 $25.55 $67.55 +142% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $18.48 $7.93 $26.41 -14% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING & STRUCTURAL $35.50 $29.20 $64.70 +111% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER $38.58 $15.70 $54.28 +132% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER $29.93 $9.10 $39.03 +67% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDE $27.71 $9.10 $36.81 +57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE $38.80 $15.70 $54.50 +133% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $42.92 $39.13 $82.05 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $51.29 $25.35 $76.64 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $48.79 $25.35 $74.14 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $48.29 $25.35 $73.64 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $47.99 $25.35 $73.34 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $47.17 $25.35 $72.52 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR, AND CONCRETE PUMP WITH BOOM OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR $46.31 $25.35 $71.66 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID LOADER, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, HIGHLIFT, HOIST, LOADER, RO $45.34 $25.35 $70.69 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COM $43.63 $25.35 $68.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 9 OILER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND $35.29 $25.35 $60.64 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $32.85 $20.41 $53.26 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $26.86 $17.66 $44.52 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $46.71 $26.79 $73.50 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $46.71 $26.79 $73.50 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $30.73 $26.82 $57.55 Above median +113% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $30.80 $21.51 $52.31 +76% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $33.50 $23.52 $57.02 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $40.53 $23.62 $64.15 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER DUMP: GROUP 1 DUMP, FLATBED; PICKUP PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRIST $31.03 $0.70 $31.73 +20% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2 SEMI PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE $31.18 $0.70 $31.88 +20% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3 LOWBOY PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF T $31.28 $0.70 $31.98 +21% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $13.57 $1.18 $14.75 Above median -44% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Monroe, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Monroe

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260092-15465-bld →