Heavy Construction — Menominee, Michigan

WD MI20260045-15512-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Menominee, Michigan (construction type: heavy) is $34.19/hr base + $24.65/hr fringe = $58.84/hr total package (WD MI20260045-15512-hvy, Rev. 1).

Scroll down for all 30 trade classifications covered by this determination.

WD Number: MI20260045-15512-hvy
Revision: 1
Construction Type: heavy
State: Michigan (MI)
County: Menominee
Effective: May 17, 2026
Trades covered: 30
Official source: SAM.gov reference MI20260045View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $34.19 $24.65 $58.84 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $34.01 $23.14 $57.15 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.17 $10.13 $30.30 +7% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (MENOMINEE & SCHOOLCRAFT COUNTIES) $33.43 $21.78 $55.21 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (MENOMINEE COUNTY) $40.25 $23.14 $63.39 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: CONTRACTS $135,000 AND UNDER $31.44 $18.59 $50.03 Top 10% +43% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: CONTRACTS OVER $135,000 $33.44 $18.67 $52.11 Top 10% +49% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ELECTRICAL CONTRACTS OVER $180,000.$ 33.94 21.80 ELECTRICIAN: ELECTRICAL CONTRACTS OF $180,000 OR LESS $31.75 $21.73 $53.48 +53% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY $41.05 $33.67 $74.72 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( COMMON OR GENERAL) $21.19 $12.85 $34.04 Bottom 10% +45% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( GRADE CHECKER) $21.51 $12.85 $34.36 Bottom 10% +47% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( MASON TENDER-CEMENT/CONCRETE) $21.33 $12.85 $34.18 Bottom 10% +46% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( PIPELAYER) $21.56 $12.85 $34.41 Bottom 10% +47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $10.89 $1.74 $12.63 -46% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; COMPACTOR; SCRAPER; LOADER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM $40.51 $25.00 $65.51 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 $37.26 $25.00 $62.26 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR POWER EQUIPMENT: GROUP 3 OILER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER H $35.86 $12.50 $48.36 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $12.98 $6.12 $19.10 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $16.63 $5.85 $22.48 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 120' OR LONGER FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE $43.81 $25.00 $68.81 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE $44.63 $25.00 $69.63 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE $44.92 $25.00 $69.92 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.74 $7.93 $21.67 Above median $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $34.48 $25.18 $59.66 +61% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER $45.98 $25.25 $71.23 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 2 TRENCHER $41.25 $25.25 $66.50 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 3 BOOM TRUCK $40.52 $25.25 $65.77 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR $39.95 $25.25 $65.20 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.63 $1.25 $13.88 -48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.55 $0.75 $34.30 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Menominee, MI — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Menominee

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260045-15512-hvy →