Building Construction — Menominee, Michigan

WD MI20260156-15512-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE in Menominee, Michigan (construction type: building) is $44.92/hr base + $25.00/hr fringe = $69.92/hr total package (WD MI20260156-15512-bld, Rev. 1).

Scroll down for all 30 trade classifications covered by this determination.

WD Number: MI20260156-15512-bld
Revision: 1
Construction Type: building
State: Michigan (MI)
County: Menominee
Effective: May 17, 2026
Trades covered: 30
Official source: SAM.gov reference MI20260156View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE $44.92 $25.00 $69.92 Top 10% $0.00 $0.00 $0.00 $0.00
220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE $44.63 $25.00 $69.63 Above median $0.00 $0.00 $0.00 $0.00
220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE $43.81 $25.00 $68.81 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $53.18 $22.78 $75.96 Above median +246% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $45.24 $30.56 $75.80 Above median +245% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $37.64 $81.14 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.19 $24.65 $56.84 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND SOFT FLOOR LAYER - CARPET (MENOMINEE C $34.01 $23.14 $57.15 +94% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.17 $10.13 $30.30 +7% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING $33.94 $21.80 $55.74 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (MENOMINEE COUNTY) $33.43 $21.78 $55.21 +58% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $17.50 $2.27 $19.77 -29% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY $35.20 $32.97 $68.17 Bottom 10% +122% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.18 $13.45 $41.63 Above median +78% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $14.95 $0.00 $14.95 Top 10% -36% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $41.00 $23.43 $64.43 +61% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $24.04 $6.03 $30.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $19.60 $7.31 $26.91 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $28.73 $15.92 $44.65 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER $16.58 $2.84 $19.42 -18% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $45.44 $28.43 $73.87 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER.$ 34.59 27.53 PIPEFITTER $34.59 $27.53 $62.12 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER PREMIUM RATE: MAIN BOOM AND JIB 3 $40.51 $25.00 $65.51 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE $37.26 $25.00 $62.26 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN $35.86 $12.50 $48.36 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $26.50 $15.95 $42.45 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $27.24 $29.85 $57.09 +93% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $32.74 $29.85 $62.59 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.19 $24.65 $56.84 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $17.44 $4.51 $21.95 Above median -17% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Menominee, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Menominee

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260156-15512-bld →