Heavy Construction — Livingston, Michigan

WD MI20260064-17091-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER in Livingston, Michigan (construction type: heavy) is $29.93/hr base + $9.10/hr fringe = $39.03/hr total package (WD MI20260064-17091-hvy, Rev. 1).

Scroll down for all 48 trade classifications covered by this determination.

WD Number: MI20260064-17091-hvy
Revision: 1
Construction Type: heavy
State: Michigan (MI)
County: Livingston
Effective: May 17, 2026
Trades covered: 48
Official source: SAM.gov reference MI20260064View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER $29.93 $9.10 $39.03 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $36.74 $80.24 Above median +151% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $42.44 $31.43 $73.87 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $36.21 $21.06 $57.27 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $25.58 $12.88 $38.46 Above median +35% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $24.64 $12.88 $37.52 Above median +32% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.23 $22.11 $54.34 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $51.32 $28.54 $79.86 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $56.05 $30.52 $86.57 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $45.00 $31.37 $76.37 Above median +119% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $33.37 $69.92 Above median +128% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $35.93 $72.48 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 COMMON OR GENERAL; GRADE CHECKER COMMON OR GENERAL; GRADE CHECKER $38.11 $15.45 $53.56 +129% vs market $0.00 $0.00 $0.00 $0.00
LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 MASON TENDER - CEMENT/CONCRETE $38.33 $15.45 $53.78 +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 3 PIPELAYER $38.47 $15.45 $53.92 +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $25.20 $12.95 $38.15 Top 10% +63% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER $32.53 $13.45 $45.98 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER $38.00 $18.25 $56.25 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE.$ 19.59 12.95 LABORER: PIPELAYER.$ 25.45 12.95 LABORER: GRADE CHECKER $25.50 $12.95 $38.45 +64% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE.$ 19.59 12.95 LABORER: PIPELAYER.$ 25.65 12.95 LABORER: GRADE CHECKER $25.50 $12.95 $38.45 +64% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-CEMENT/CONCRETE $25.31 $12.95 $38.26 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: CABLE SPLICER $55.65 $23.64 $79.29 Bottom 10% +60% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN $54.41 $23.28 $77.69 +56% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMEN/CABLE SPLICER $61.06 $25.11 $86.17 +73% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER $27.71 $9.10 $36.81 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $18.00 $5.00 $23.00 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $22.00 $5.00 $27.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR; BORING MACHINE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR $44.00 $25.25 $69.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DA $41.32 $25.25 $66.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS D $41.32 $25.25 $66.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS D $35.46 $25.25 $60.71 $0.00 $0.00 $0.00 $0.00
PAINTER $21.89 $11.85 $33.74 Above median +42% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER $25.06 $14.75 $39.81 +68% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $25.86 $14.75 $40.61 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $38.48 $30.22 $68.70 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $26.46 $20.71 $47.17 Bottom 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER $40.41 $29.35 $69.76 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $35.77 $35.13 $70.90 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $44.31 $23.70 $68.01 +84% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $42.29 $23.94 $66.23 +79% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER $45.98 $25.25 $71.23 +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 2 TRENCHER $41.25 $25.25 $66.50 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK $40.52 $25.25 $65.77 +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER $39.95 $25.25 $65.20 +117% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.40 $0.75 $34.15 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER $33.50 $0.75 $34.25 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.65 $0.75 $34.40 Top 10% +30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $20.82 $3.69 $24.51 Above median -8% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Livingston, MI — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Livingston

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260064-17091-hvy →