Building Construction — Livingston, Michigan
WD MI20260090-17091-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY in Livingston, Michigan (construction type: building) is $41.28/hr base + $25.25/hr fringe = $66.53/hr total package (WD MI20260090-17091-bld, Rev. 1).
Scroll down for all 61 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CH | $47.28 | $25.25 | $72.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 Above median +190% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $43.50 | $36.74 | $80.24 Above median +151% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN DAYS BEFORE SAID HOLIDAY WITHIN | $40.71 | $28.21 | $68.92 +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDA | $36.10 | $26.22 | $62.32 +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: FLOOR LAYER - CARPET, RESILIENT & VINYL FLOORING | $36.21 | $21.06 | $57.27 +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: FLOOR LAYER - CARPET, RESILIENT, & VINYL FLOORING | $36.76 | $21.11 | $57.87 +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDING | $42.44 | $31.43 | $73.87 +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDING | $36.21 | $21.06 | $57.27 +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $25.58 | $12.88 | $38.46 Above median +35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $24.64 | $12.88 | $37.52 Above median +32% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $32.23 | $22.11 | $54.34 Above median +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CREDIT | $65.45 | $38.44 | $103.89 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS | $28.14 | $8.89 | $37.03 +6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING | $38.79 | $19.87 | $58.66 +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING | $31.20 | $10.97 | $42.17 +21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: LOW VOLTAGE WIRING & ALARM INSTALLATION | $36.89 | $14.16 | $51.05 +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER PAID HOLIDAYS: NEW YEAR'S DAY, DECORATION DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS W | $42.00 | $25.55 | $67.55 +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| INSTALLER - OVERHEAD DOOR | $27.98 | $0.00 | $27.98 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER STRUCTURAL | $30.02 | $27.43 | $57.45 Bottom 10% +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 -14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $36.55 | $33.37 | $69.92 Above median +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 | $72.48 Above median +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS ABATEMENT | $39.08 | $15.92 | $55.00 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $17.64 | $4.95 | $22.59 Above median -3% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | $38.11 | $15.45 | $53.56 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER; SANDBLASTER (EAST OF OAK GROVE RD. & NORTH OF M-59) | $38.00 | $18.25 | $56.25 +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER | $29.93 | $9.10 | $39.03 +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDE | $27.71 | $9.10 | $36.81 +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | $38.33 | $15.45 | $53.78 +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $38.47 | $15.45 | $53.92 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $42.92 | $39.13 | $82.05 Above median +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE O | $43.93 | $25.25 | $69.18 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.5 | $39.57 | $25.25 | $64.82 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE | $39.57 | $25.25 | $64.82 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE | $33.71 | $25.25 | $58.96 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE | $31.23 | $25.25 | $56.48 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $32.85 | $20.41 | $53.26 Above median +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $28.75 | $18.68 | $47.43 Top 10% +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHING/TAPING | $32.85 | $20.41 | $53.26 Above median +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHING/TAPING | $28.32 | $16.88 | $45.20 +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $26.86 | $17.66 | $44.52 Above median +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION | $51.30 | $25.87 | $77.17 +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION | $40.30 | $38.80 | $79.10 +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY | $46.29 | $25.43 | $71.72 +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $25.39 | $12.53 | $37.92 +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $23.73 | $12.88 | $36.61 Bottom 10% +24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $30.63 | $14.07 | $44.70 +51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION | $43.34 | $32.92 | $76.26 +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION | $51.30 | $25.87 | $77.17 +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, I | $46.29 | $25.43 | $71.72 +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER | $42.74 | $21.53 | $64.27 Top 10% +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 | $42.74 | $21.53 | $64.27 Top 10% +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $42.67 | $21.62 | $64.29 Above median +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $41.34 | $27.39 | $68.73 +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN DAYS BEFORE SAID HOLIDAY WIT | $33.50 | $23.52 | $57.02 +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOL | $33.50 | $23.52 | $57.02 +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN DAYS BEFORE SAID HOLIDAY WITHI | $40.53 | $23.62 | $64.15 +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLID | $40.53 | $23.62 | $64.15 +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 Above median -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Livingston, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Livingston
Compliance Notes
- This wage determination applies to federal contracts for building construction in Livingston, Michigan.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.