Building Construction — Livingston, Michigan

WD MI20260090-17091-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY in Livingston, Michigan (construction type: building) is $41.28/hr base + $25.25/hr fringe = $66.53/hr total package (WD MI20260090-17091-bld, Rev. 1).

Scroll down for all 61 trade classifications covered by this determination.

WD Number: MI20260090-17091-bld
Revision: 1
Construction Type: building
State: Michigan (MI)
County: Livingston
Effective: May 17, 2026
Trades covered: 61
Official source: SAM.gov reference MI20260090View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $41.28 $25.25 $66.53 Bottom 10% $0.00 $0.00 $0.00 $0.00
400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CH $47.28 $25.25 $72.53 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.00 $23.65 $63.65 Above median +190% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $36.74 $80.24 Above median +151% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN DAYS BEFORE SAID HOLIDAY WITHIN $40.71 $28.21 $68.92 +128% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDA $36.10 $26.22 $62.32 +106% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: FLOOR LAYER - CARPET, RESILIENT & VINYL FLOORING $36.21 $21.06 $57.27 +94% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: FLOOR LAYER - CARPET, RESILIENT, & VINYL FLOORING $36.76 $21.11 $57.87 +96% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDING $42.44 $31.43 $73.87 +150% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDING $36.21 $21.06 $57.27 +94% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $25.58 $12.88 $38.46 Above median +35% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $24.64 $12.88 $37.52 Above median +32% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.23 $22.11 $54.34 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
CREDIT $65.45 $38.44 $103.89 Above median $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS $28.14 $8.89 $37.03 +6% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING $38.79 $19.87 $58.66 +68% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING $31.20 $10.97 $42.17 +21% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: LOW VOLTAGE WIRING & ALARM INSTALLATION $36.89 $14.16 $51.05 +97% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER PAID HOLIDAYS: NEW YEAR'S DAY, DECORATION DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS W $42.00 $25.55 $67.55 +142% vs market $0.00 $0.00 $0.00 $0.00
INSTALLER - OVERHEAD DOOR $27.98 $0.00 $27.98 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER STRUCTURAL $30.02 $27.43 $57.45 Bottom 10% +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $18.48 $7.93 $26.41 -14% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $33.37 $69.92 Above median +128% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $35.93 $72.48 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS ABATEMENT $39.08 $15.92 $55.00 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.64 $4.95 $22.59 Above median -3% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER $38.11 $15.45 $53.56 +129% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER; SANDBLASTER (EAST OF OAK GROVE RD. & NORTH OF M-59) $38.00 $18.25 $56.25 +140% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER $29.93 $9.10 $39.03 +67% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDE $27.71 $9.10 $36.81 +57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE $38.33 $15.45 $53.78 +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $38.47 $15.45 $53.92 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $42.92 $39.13 $82.05 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE O $43.93 $25.25 $69.18 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.5 $39.57 $25.25 $64.82 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE $39.57 $25.25 $64.82 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE $33.71 $25.25 $58.96 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE $31.23 $25.25 $56.48 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $32.85 $20.41 $53.26 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $28.75 $18.68 $47.43 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $32.85 $20.41 $53.26 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $28.32 $16.88 $45.20 +90% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $26.86 $17.66 $44.52 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION $51.30 $25.87 $77.17 +108% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION $40.30 $38.80 $79.10 +114% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY $46.29 $25.43 $71.72 +94% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $25.39 $12.53 $37.92 +28% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $23.73 $12.88 $36.61 Bottom 10% +24% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $30.63 $14.07 $44.70 +51% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION $43.34 $32.92 $76.26 +106% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION $51.30 $25.87 $77.17 +108% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, I $46.29 $25.43 $71.72 +94% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER $42.74 $21.53 $64.27 Top 10% +114% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 $42.74 $21.53 $64.27 Top 10% +114% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $42.67 $21.62 $64.29 Above median +138% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $41.34 $27.39 $68.73 +86% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN DAYS BEFORE SAID HOLIDAY WIT $33.50 $23.52 $57.02 +122% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOL $33.50 $23.52 $57.02 +122% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN DAYS BEFORE SAID HOLIDAY WITHI $40.53 $23.62 $64.15 +150% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLID $40.53 $23.62 $64.15 +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $13.57 $1.18 $14.75 Above median -44% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Livingston, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Livingston

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260090-17091-bld →