Building Construction — Calhoun, Michigan
WD MI20260079-15490-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY in Calhoun, Michigan (construction type: building) is $47.28/hr base + $25.25/hr fringe = $72.53/hr total package (WD MI20260079-15490-bld, Rev. 1).
Scroll down for all 36 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 Above median +190% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $43.50 | $36.74 | $80.24 Above median +151% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $35.21 | $24.26 | $59.47 Above median +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | $28.29 | $21.42 | $49.71 Top 10% +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $25.23 | $1.80 | $27.03 -5% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.00 | $25.74 | $66.74 Above median +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 -14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 | $66.06 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $27.21 | $13.45 | $40.66 Above median +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE & IRRIGATION | $10.38 | $0.50 | $10.88 Above median -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $40.04 | $26.47 | $66.51 Above median +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $19.68 | $6.64 | $26.32 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: COMPACTOR | $17.68 | $6.70 | $24.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE O | $43.93 | $25.25 | $69.18 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CRANE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG | $42.25 | $25.25 | $67.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.5 | $39.57 | $25.25 | $64.82 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE | $39.57 | $25.25 | $64.82 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE | $33.37 | $25.25 | $58.62 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE | $31.23 | $25.25 | $56.48 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $27.07 | $16.46 | $43.53 +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHING/TAPING | $27.32 | $16.72 | $44.04 +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $27.07 | $16.56 | $43.63 Above median +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE | $46.29 | $25.43 | $71.72 +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $21.18 | $12.43 | $33.61 Bottom 10% +13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WOR | $46.29 | $25.43 | $71.72 +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 | $42.74 | $21.53 | $64.27 Top 10% +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $33.98 | $18.51 | $52.49 Above median +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $41.34 | $27.39 | $68.73 +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $26.24 | $21.13 | $47.37 Above median +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $27.35 | $22.20 | $49.55 Above median +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $17.26 | $11.42 | $28.68 Top 10% +8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.50 | $0.44 | $14.94 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 Above median -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Calhoun, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Calhoun
Compliance Notes
- This wage determination applies to federal contracts for building construction in Calhoun, Michigan.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.