The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Middlesex, Massachusetts (construction type: highway) is $47.93/hr base + $19.46/hr fringe = $67.39/hr total package (WD MA20260021-15427-hwy, Rev. 1).

Scroll down for all 24 trade classifications covered by this determination.

WD Number: MA20260021-15427-hwy
Revision: 1
Construction Type: highway
State: Massachusetts (MA)
County: Middlesex
Effective: May 17, 2026
Trades covered: 24
Official source: SAM.gov reference MA20260021View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $47.93 $19.46 $67.39 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $56.70 $21.08 $77.78 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $66.17 $37.08 $103.25 Top 10% +162% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $57.87 $37.67 $95.54 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
LABORER $33.25 $22.92 $56.17 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $33.50 $22.92 $56.42 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $36.58 $19.40 $55.98 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $41.78 $18.37 $60.15 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GUARDRAIL INSTALLATION $37.70 $15.37 $53.07 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $57.61 $0.00 $57.61 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $64.67 $0.00 $64.67 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $48.14 $17.02 $65.16 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $44.46 $16.94 $61.40 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POST DRIVER $41.49 $23.07 $64.56 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $40.87 $13.86 $54.73 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: STEEL $56.76 $36.00 $92.76 Top 10% +245% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $45.65 $23.33 $68.98 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; GRADALL; LOADER; PAVER FOOTNOTE FOR POWER E $57.83 $33.70 $91.53 +162% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; MILLING MACHINE; ROLLER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S $57.18 $33.70 $90.88 +160% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $23.00 $20.44 $43.44 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $44.49 $12.41 $56.90 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: CONCRETE TRUCK $33.69 $15.79 $49.48 Bottom 10% +70% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $38.92 $9.73 $48.65 Top 10% +67% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $48.53 $0.00 $48.53 Top 10% +66% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Middlesex, MA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.