The Davis-Bacon prevailing wage for BOILERMAKER in Middlesex, Massachusetts (construction type: building) is $50.62/hr base + $28.82/hr fringe = $79.44/hr total package (WD MA20260001-15427-bld, Rev. 1).
Scroll down for all 100 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER | $50.62 | $28.82 | $79.44 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER (BOSTON CHAPTER MIDDLESEX; NORFOLK; AND SUFFOLK) | $64.50 | $37.54 | $102.04 Top 10% +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER (LOWELL CHAPTER MIDDLESEX; AND NORFOLK) | $60.26 | $33.71 | $93.97 Bottom 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER AND PLASTERER (LOWELL CHAPTER MIDDLESEX) | $60.26 | $33.71 | $93.97 +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER AND PLASTERER (WALTHAM CHAPTER MIDDLESEX) | $64.50 | $37.54 | $102.04 +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CEMENT MASON AND PLASTERER (LYNN CHAPTER ESSEX; AND MIDDLESEX) | $64.50 | $37.54 | $102.04 +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CEMENT MASON AND PLASTERER (NEW BEDFORD BARNSTABLE; BRISTOL; DUKES; AND NANTUCKET COUNTIES) | $64.50 | $37.54 | $102.04 +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CEMENT MASON AND PLASTERER (NEWTON CHAPTER MIDDLESEX AND NORFOLK) | $64.50 | $37.54 | $102.04 +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CEMENT MASON AND PLASTERER (QUINCY CHAPTER NORFOLK COUNTY) | $64.50 | $37.54 | $102.04 +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CEMENT MASON, PLASTERER (FOXBORO CHAPTER BRISTOL AND NORFOLK COUNTIES) | $60.26 | $33.71 | $93.97 +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $46.43 | $28.35 | $74.78 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (BARNSTABLE; BRISTOL; AND NORFOLK COUNTIES) | $39.28 | $27.90 | $67.18 +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (BRISTOL; ESSEX; MIDDLESEX; AND NORFOLK) | $50.10 | $31.45 | $81.55 +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (MIDDLESEX; NORFOLK; AND SUFFOLK) | $61.19 | $31.55 | $92.74 +171% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (NORFOLK COUNTY) | $50.10 | $31.45 | $81.55 +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $49.19 | $40.86 | $90.05 Top 10% +193% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 Y | $41.14 | $37.35 | $78.49 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 Y | $41.02 | $37.35 | $78.37 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (BARNSTABLE; BRISTOL; DUKES; NANTUCKET AND NORFOLK) | $50.02 | $31.05 | $81.07 +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (BRISTOL) | $56.11 | $24.74 | $80.85 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ESSEX) | $66.17 | $37.08 | $103.25 Top 10% +162% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ESSEX; MIDDLESEX) | $66.17 | $37.08 | $103.25 Top 10% +162% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ESSEX; MIDDLESEX; NORFOLK (BELLINGHAM, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, FRANKLOIN, MEDFIELD, MEDWAY, MILLI | $66.17 | $37.08 | $103.25 Top 10% +162% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (MIDDLESEX) | $48.16 | $36.20 | $84.36 Top 10% +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE FOR ELEVATOR MECHANICS: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BAS | $74.17 | $38.44 | $112.61 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: CARPET | $49.18 | $31.75 | $80.93 Top 10% +162% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: CARPET (MIDDLESEX; NORFOLK; AND SUFFOLK) | $57.49 | $31.75 | $89.24 +189% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $46.26 | $36.00 | $82.26 Above median +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER FOOTNOTE: A. PAID HOLIDAY: LABOR DAY | $43.13 | $21.00 | $64.13 +31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS | $55.45 | $36.63 | $92.08 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR/ASBESTOS WORKER ZONE A- BARNSTABLE COUNTY BRISTOL COUNTY, MIDDLESEX COUNTY, AND NORFOLK COUNTY | $55.45 | $36.63 | $92.08 +235% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR/ASBESTOS WORKER ZONE B- BARNSTABLE COUNTY, BRISTOL COUNTY,AND NORFOLK COUNTY | $55.45 | $36.63 | $92.08 +235% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR/ASBESTOS WORKER: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICA | $55.45 | $36.63 | $92.08 +235% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (BARNSTABLE; BRISTOL; DUKES; NANTUCKET; NORFOLK) | $43.03 | $33.53 | $76.56 +37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (MIDDLESEX; NORFOLK) | $57.57 | $37.67 | $95.24 Top 10% +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS | $53.46 | $37.67 | $91.13 Top 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS | $57.87 | $37.67 | $95.54 Top 10% +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1- LABORERS; CARPENTER TENDERS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; MIDDLESEX; NORFOLK) | $38.95 | $29.70 | $68.65 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1- LABORERS; CARPENTER TENDERS (SUFFOLK COUNTY; MIDDLESEX COUNTY; NORFOLK COUNTY) | $46.10 | $29.70 | $75.80 +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 - JACKHAMMER OPERATOR; PAVEMENT BREAKER; ASPHALT RAKER CARBIDE CORE DRILLING MACHINE; CHAIN SAW OPERATOR; PIPELAYER; BARCO TYPE JUMP | $46.10 | $29.70 | $75.80 +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2- JACKHAMMER OPERATOR; PAVEMENT BREAKER; ASPHALT RAKER CARBIDE CORE DRILLING MACHINE; CHAIN SAW OPERATOR; PIPELAYER; BARCO TYPE JUMPI | $38.95 | $29.70 | $68.65 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3- AIR TRACK, BLOCK PAVER; HAMMER; CURB SETTER, HYDRAULIC AND SIMILAR SELF-POWERED DRILLS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESS | $38.95 | $29.70 | $68.65 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3- AIR TRACK, BLOCK PAVER; RAMMER; CURB SETTER, HYDRAULIC AND SIMILAR SELF-POWERED DRILLS (SUFFOLK COUNTY; MIDDLESEX COUNTY; NORFOLK C | $46.10 | $29.70 | $75.80 +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 4- BLASTER; POWDERMAN (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; MIDDLESEX; NORFOLK) | $38.95 | $29.70 | $68.65 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 4- BLASTER; POWDERMAN (SUFFOLK COUNTY; MIDDLESEX COUNTY; NORFOLK COUNTY) | $46.10 | $29.70 | $75.80 Bottom 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 5- PRE-CAST FLOOR AND ROOF PLANK ERECTOR (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; MIDDLESEX; NORFOLK) | $38.95 | $29.70 | $68.65 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 5- PRE-CAST FLOOR AND ROOF PLANK ERECTOR (SUFFOLK COUNTY; MIDDLESEX COUNTY; NORFOLK COUNTY) | $46.10 | $29.70 | $75.80 +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 6- ASBESTOS REMOVAL LABORERS/HAZ-MAT LABORERS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; MIDDLESEX; NORFOLK) | $46.10 | $29.70 | $75.80 +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 6- ASBESTOS REMOVAL LABORERS/HAZ-MAT LABORERS (SUFFOLK COUNTY; MIDDLESEX COUNTY; NORFOLK COUNTY) | $46.10 | $29.70 | $75.80 +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 7 - FLAGGERS (SUFFOLK COUNTY; MIDDLESEX COUNTY; NORFOLK COUNTY) | $27.01 | $29.70 | $56.71 +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 1 LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS, PLASTERER TENDERS | $38.95 | $29.70 | $68.65 +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 2 ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENDER; PIPELAYER; PNEUMATIC DRILL OPER | $39.20 | $29.70 | $68.90 +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 3 AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER, HYDRAULIC AND SIMILAR SELF POWERED DRILLS | $39.70 | $29.70 | $69.40 +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 4 BLASTER; POWDERMAN | $39.95 | $29.70 | $69.65 +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 5 FLAGGER | $39.70 | $29.70 | $69.40 +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 6 ASBESTOS ABATEMENT; TOXIC AND HAZARDOUS WASTE LABORERS | $40.95 | $29.70 | $70.65 +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS...$ 45.35 29.70 LABORERS:, WRECKING: GROUP 4 YARDMAN...$ 42.25 29.70 LABORERS:, WRECKING: GROUP | $47.00 | $29.70 | $76.70 +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE | $46.25 | $29.70 | $75.95 Top 10% +153% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND | $49.65 | $26.72 | $76.37 Top 10% +49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LISTED HOLIDAYS | $58.41 | $30.19 | $88.60 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LISTED HOLIDAYS | $32.13 | $12.70 | $44.83 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE & TILE FINISHER | $49.32 | $35.26 | $84.58 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE, TILE & TERRAZZO WORKERS | $64.52 | $37.51 | $102.03 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $50.47 | $33.50 | $83.97 Above median +167% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $45.03 | $33.25 | $78.28 Above median +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| NANTUCKET; PLYMOUTH) | $53.25 | $29.75 | $83.00 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OVER 295 FT. +11.86 OVER 350 FT. +13.82 | $30.85 | $33.70 | $64.55 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OVER 295 FT. +11.86 OVER 350 FT. +13.82 | $46.52 | $33.70 | $80.22 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OVER 295 FT. +11.86 OVER 350 FT. +13.82 | $37.02 | $33.70 | $70.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| OVER 295 FT. +11.86 OVER 350 FT. +13.82 | $57.83 | $33.70 | $91.53 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER BRUSH, TAPER | $44.32 | $36.00 | $80.32 Bottom 10% +199% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER BRUSH, TAPER | $46.26 | $36.00 | $82.26 Top 10% +206% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER SPRAY, SANDBLAST | $45.72 | $36.00 | $81.72 Bottom 10% +204% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER SPRAY, SANDBLAST | $47.66 | $36.00 | $83.66 Top 10% +211% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN (SUFFOLK; AND THOSE AREAS OF BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX & NORFOLK COUNTIES SITUATED INSIDE BOSTON BELTWAY AND NORTH OF CAPE C | $55.79 | $35.47 | $91.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN (THE AREAS OF BARNSTABLE, BRISTOL, AND NORFOLK COUNTIES SITUATED OUTSIDE BOSTON BELTWAY AND SOUTH OF CAPE COD CANAL) | $55.79 | $35.47 | $91.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN (THOSE AREAS OF ESSEX AND MIDDLESEX COUNTIES SITUATED OUTSIDE BOSTON BELTWAY) | $49.19 | $35.47 | $84.66 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER (ESSEX; MIDDLESEX (ACTON, ARLINGTON, ASHFORD, AYER-EXCEPT WEST OF GREENVILLE BRANCH OF BOSTON & MAINE RAIL ROAD, BEDFORD, BELMONT, BILL | $66.58 | $39.22 | $105.80 +164% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER TENDER | $38.95 | $29.70 | $68.65 Top 10% +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER TENDER (BARNSTABLE, BRISTOL, DUKES, ESSEX, NANTUCKET, MIDDLESEX; NORFOLK COUNTIES) | $38.95 | $29.70 | $68.65 +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER TENDER (SUFFOLK COUNTY; MIDDLESEX COUNTY; NORFOLK COUNTY) | $46.10 | $29.70 | $75.80 +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER (ESSEX) | $69.84 | $36.43 | $106.27 Top 10% +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER (ESSEX; MIDDLESEX (ACTON, ARLINGTON, ASHFORD, AYER-EXCEPT WEST OF GREENVILLE BRANCH OF BOSTON & MAINE RAIL ROAD, BEDFORD, BELMONT, BILLERI | $69.84 | $36.43 | $106.27 +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS (BARNSTABLE; BRISTOL; DUKES; NANTUCKET; AND NORFOLK COUNTIES) | $52.49 | $33.60 | $86.09 +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS (MIDDLESEX) | $55.00 | $31.57 | $86.57 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2 SONIC OR VIBRATORY HAMMER; GRADER; SCRAPER; TANDEM SCRAPER; CONCRETE PUMP; BULLDOZER; TRACTOR; YORK RAKE; MULCHING | $57.18 | $33.70 | $90.88 +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, M | $25.02 | $33.70 | $58.72 +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFERS | $53.53 | $35.69 | $89.22 Top 10% +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER (ESSEX; MIDDLESEX; NORFOLK; PLYMOUTH; SUFFOLK) | $60.00 | $48.78 | $108.78 Top 10% +186% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER (BRISTOL (PORTION WITHIN 35 MILE RADIUS FROM BOSTON CITY HALL; MIDDLESEX; NORFOLK; PLYMOUTH; SUFFOLK) A. PAID HOLIDAYS: MEMORIAL DAY | $72.05 | $40.76 | $112.81 +182% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER (BRISTOL) A. PAID HOLIDAYS: MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS BEEN IN | $64.85 | $40.76 | $105.61 +164% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TELEDATA SYSTEM INSTALLER (BARNSTABLE; BRISTOL; DUKES; NANTUCKET AND NORFOLK) | $42.52 | $28.47 | $70.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| TELEDATA SYSTEM INSTALLER (BRISTOL) | $42.09 | $19.71 | $61.80 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TELEDATA SYSTEM INSTALLER (MIDDLESEX) | $36.12 | $34.51 | $70.63 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER | $63.44 | $37.33 | $100.77 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HA | $40.78 | $37.35 | $78.13 Top 10% +168% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HAZARDOUS | $40.95 | $37.35 | $78.30 Top 10% +169% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTO | $41.24 | $37.35 | $78.59 Top 10% +170% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HA | $41.53 | $37.35 | $78.88 Top 10% +171% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATE | $41.82 | $37.35 | $79.17 Top 10% +172% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Middlesex, MA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Middlesex
Compliance Notes
- This wage determination applies to federal contracts for building construction in Middlesex, Massachusetts.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.