Highway Construction — Dukes, Massachusetts

WD MA20260014-15432-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Dukes, Massachusetts (construction type: highway) is $43.33/hr base + $27.82/hr fringe = $71.15/hr total package (WD MA20260014-15432-hwy, Rev. 1).

Scroll down for all 9 trade classifications covered by this determination.

WD Number: MA20260014-15432-hwy
Revision: 1
Construction Type: highway
State: Massachusetts (MA)
County: Dukes
Effective: May 17, 2026
Trades covered: 9
Official source: SAM.gov reference MA20260014View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $43.33 $27.82 $71.15 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $41.89 $33.90 $75.79 Top 10% +35% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $43.03 $33.53 $76.56 Top 10% +37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR $38.95 $26.91 $65.86 +119% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $30.80 $4.49 $35.29 Above median +18% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $40.83 $23.49 $64.32 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA $42.88 $31.04 $73.92 +111% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VET $42.88 $31.04 $73.92 +111% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VET $39.12 $31.04 $70.16 +100% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Dukes, MA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Dukes

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MA20260014-15432-hwy →