Highway Construction — Montgomery, Maryland
WD MD20260043-16459-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Montgomery, Maryland (construction type: highway) is $37.50/hr base + $14.78/hr fringe = $52.28/hr total package (WD MD20260043-16459-hwy, Rev. 1).
Scroll down for all 34 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $37.50 | $14.78 | $52.28 +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $34.41 | $14.49 | $48.90 +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER-SHORING SCAFFOLD BUILDER | $34.41 | $14.49 | $48.90 Above median +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $35.04 | $25.46 | $60.50 Above median +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $29.20 | $8.82 | $38.02 +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $30.14 | $8.82 | $38.96 +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT RAKER | $29.20 | $8.82 | $38.02 Top 10% +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $30.14 | $8.82 | $38.96 Above median +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $44.18 | $16.08 | $60.26 Top 10% +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $25.70 | $7.00 | $32.70 Above median +12% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $24.50 | $7.00 | $31.50 Above median +8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $25.37 | $7.00 | $32.37 Above median +11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $26.33 | $7.00 | $33.33 Above median +14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $25.62 | $7.00 | $32.62 Above median +12% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $24.85 | $8.69 | $33.54 Above median +15% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $30.04 | $13.55 | $43.59 Above median +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $33.00 | $13.55 | $46.55 Above median +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $24.88 | $7.00 | $31.88 Above median +9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR (SKID STEER) | $30.04 | $13.55 | $43.59 Above median +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE | $33.00 | $13.55 | $46.55 Above median +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $28.10 | $7.00 | $35.10 +20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: EXCAVATOR | $31.25 | $7.00 | $38.25 +31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $26.85 | $7.00 | $33.85 Above median +16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: MILLING MACHINE | $22.79 | $7.00 | $29.79 Above median +2% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $40.46 | $26.05 | $66.51 +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| STONE MASON | $44.30 | $21.22 | $65.52 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & TERRAZZO FINISHER | $28.09 | $12.59 | $40.68 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & TERRAZZO MECHANIC | $33.41 | $14.24 | $47.65 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $21.06 | $7.00 | $28.06 Above median +2% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $25.62 | $7.00 | $32.62 Above median +19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $24.30 | $7.00 | $31.30 Above median +14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $22.36 | $7.84 | $30.20 Above median +10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $22.15 | $7.00 | $29.15 Above median +6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $23.05 | $7.00 | $30.05 Above median +9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Montgomery, MD — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Montgomery
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Montgomery, Maryland.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.