Highway Construction — Montgomery, Maryland

WD MD20260043-16459-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Montgomery, Maryland (construction type: highway) is $37.50/hr base + $14.78/hr fringe = $52.28/hr total package (WD MD20260043-16459-hwy, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: MD20260043-16459-hwy
Revision: 1
Construction Type: highway
State: Maryland (MD)
County: Montgomery
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference MD20260043View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $37.50 $14.78 $52.28 +86% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $34.41 $14.49 $48.90 +69% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER-SHORING SCAFFOLD BUILDER $34.41 $14.49 $48.90 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $35.04 $25.46 $60.50 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
LABORER $29.20 $8.82 $38.02 +71% vs market $0.00 $0.00 $0.00 $0.00
LABORER $30.14 $8.82 $38.96 +75% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $29.20 $8.82 $38.02 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $30.14 $8.82 $38.96 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $44.18 $16.08 $60.26 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $25.70 $7.00 $32.70 Above median +12% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $24.50 $7.00 $31.50 Above median +8% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $25.37 $7.00 $32.37 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $26.33 $7.00 $33.33 Above median +14% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $25.62 $7.00 $32.62 Above median +12% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $24.85 $8.69 $33.54 Above median +15% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $30.04 $13.55 $43.59 Above median +50% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $33.00 $13.55 $46.55 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $24.88 $7.00 $31.88 Above median +9% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (SKID STEER) $30.04 $13.55 $43.59 Above median +50% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE $33.00 $13.55 $46.55 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $28.10 $7.00 $35.10 +20% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR $31.25 $7.00 $38.25 +31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $26.85 $7.00 $33.85 Above median +16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MILLING MACHINE $22.79 $7.00 $29.79 Above median +2% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $40.46 $26.05 $66.51 +119% vs market $0.00 $0.00 $0.00 $0.00
STONE MASON $44.30 $21.22 $65.52 Top 10% $0.00 $0.00 $0.00 $0.00
TILE & TERRAZZO FINISHER $28.09 $12.59 $40.68 Bottom 10% $0.00 $0.00 $0.00 $0.00
TILE & TERRAZZO MECHANIC $33.41 $14.24 $47.65 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $21.06 $7.00 $28.06 Above median +2% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $25.62 $7.00 $32.62 Above median +19% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $24.30 $7.00 $31.30 Above median +14% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $22.36 $7.84 $30.20 Above median +10% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $22.15 $7.00 $29.15 Above median +6% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $23.05 $7.00 $30.05 Above median +9% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Montgomery, MD — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Montgomery

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MD20260043-16459-hwy →