Building Construction — Montgomery, Maryland

WD MD20260120-16459-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BALANCING TECHNICIAN in Montgomery, Maryland (construction type: building) is $47.92/hr base + $24.44/hr fringe = $72.36/hr total package (WD MD20260120-16459-bld, Rev. 1).

Scroll down for all 56 trade classifications covered by this determination.

WD Number: MD20260120-16459-bld
Revision: 1
Construction Type: building
State: Maryland (MD)
County: Montgomery
Effective: May 17, 2026
Trades covered: 56
Official source: SAM.gov reference MD20260120View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BALANCING TECHNICIAN $47.92 $24.44 $72.36 Top 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $37.50 $14.78 $52.28 +86% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $34.41 $14.49 $48.90 +69% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER-SHORING SCAFFOLD BUILDER $34.41 $14.49 $48.90 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $34.12 $14.86 $48.98 +108% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $29.65 $11.88 $41.53 Bottom 10% +75% vs market $0.00 $0.00 $0.00 $0.00
COMMUNICATION INSTALLER TECHNICIAN $33.04 $12.36 $45.40 Above median $0.00 $0.00 $0.00 $0.00
DRYWALL-SPACKLING, TAPING, & FINISHING $34.41 $14.49 $48.90 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $54.00 $21.77 $75.77 Above median +140% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC $54.77 $43.57 $98.34 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
FIRESTOPPER $29.81 $10.08 $39.89 Top 10% $0.00 $0.00 $0.00 $0.00
GLAZIER $35.60 $14.41 $50.01 +78% vs market $0.00 $0.00 $0.00 $0.00
INSULATION WORKER $40.02 $19.92 $59.94 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $32.40 $6.95 $39.35 +21% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $33.57 $23.75 $57.32 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $36.10 $25.52 $61.62 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.59 $6.52 $35.11 +58% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.95 $8.08 $37.03 +66% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $28.59 $6.52 $35.11 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $28.95 $8.08 $37.03 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
MECHANICAL SYSTEMS SERVICE TECH $52.27 $24.58 $76.85 Above median $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $38.49 $15.86 $54.35 Bottom 10% +58% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $28.55 $11.87 $40.42 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $35.55 $15.28 $50.83 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVER $36.60 $13.87 $50.47 Bottom 10% $0.00 $0.00 $0.00 $0.00
PLUMBER $49.00 $22.76 $71.76 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $37.50 $14.85 $52.35 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $34.18 $14.62 $48.80 Above median +67% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $28.60 $14.62 $43.22 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $31.00 $3.94 $34.94 Above median +20% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $33.00 $2.74 $35.74 Above median +23% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $31.00 $7.06 $38.06 Above median +31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $29.66 $8.67 $38.33 Above median +32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $42.43 $12.50 $54.93 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $30.46 $12.50 $42.96 Above median +47% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $30.50 $4.81 $35.31 Above median +21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (SKID STEER) $29.00 $5.75 $34.75 +19% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE $32.00 $2.29 $34.29 +18% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $41.00 $18.10 $59.10 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR $26.67 $1.50 $28.17 -3% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $36.24 $14.62 $50.86 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCREED $25.00 $9.99 $34.99 Above median +20% vs market $0.00 $0.00 $0.00 $0.00
RESILIENT FLOOR $34.12 $14.86 $48.98 Top 10% $0.00 $0.00 $0.00 $0.00
ROOFER/WATERPROOFER $52.21 $14.91 $67.12 Top 10% +168% vs market $0.00 $0.00 $0.00 $0.00
SHEETMETAL WORKER $47.92 $24.44 $72.36 Above median $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $42.32 $26.05 $68.37 +125% vs market $0.00 $0.00 $0.00 $0.00
STEAMFITTER/PIPEFITTER $52.27 $24.58 $76.85 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
STONE MASON $44.30 $21.22 $65.52 Top 10% $0.00 $0.00 $0.00 $0.00
TILE & TERRAZZO FINISHER $28.09 $12.59 $40.68 Bottom 10% $0.00 $0.00 $0.00 $0.00
TILE & TERRAZZO MECHANIC $33.41 $14.24 $47.65 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $24.50 $1.75 $26.25 Above median -5% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $15.25 $2.75 $18.00 Above median -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $27.25 $3.41 $30.66 Above median +12% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $28.25 $4.91 $33.16 Above median +21% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $24.44 $3.43 $27.87 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $31.00 $5.15 $36.15 Above median +32% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Montgomery, MD — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Montgomery

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MD20260120-16459-bld →