Highway Construction — Androscoggin, Maine

WD ME20260045-17904-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Androscoggin, Maine (construction type: highway) is $18.95/hr base + $3.23/hr fringe = $22.18/hr total package (WD ME20260045-17904-hwy, Rev. 1).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: ME20260045-17904-hwy
Revision: 1
Construction Type: highway
State: Maine (ME)
County: Androscoggin
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference ME20260045View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $18.95 $3.23 $22.18 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.27 $1.13 $20.40 -21% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $25.21 $5.63 $30.84 -5% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: LABORER $15.53 $2.04 $17.57 Top 10% $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $19.98 $2.55 $22.53 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $21.85 $0.00 $21.85 -28% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $22.33 $4.50 $26.83 -11% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $16.71 $0.63 $17.34 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.65 $1.64 $16.29 Above median -26% vs market $0.00 $0.00 $0.00 $0.00
LABORER: EPOXY INJECTOR $13.43 $1.15 $14.58 -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: WHEELMAN $22.87 $3.79 $26.66 Top 10% +22% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.09 $3.20 $23.29 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $21.03 $3.43 $24.46 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $19.52 $0.00 $19.52 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.71 $5.67 $27.38 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $27.40 $8.13 $35.53 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $19.52 $3.19 $22.71 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $24.69 $8.18 $32.87 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $28.51 $5.44 $33.95 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $20.86 $3.73 $24.59 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.74 $1.29 $16.03 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER ASPHALT $19.14 $3.43 $22.57 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $9.06 $0.00 $9.06 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $17.02 $5.37 $22.39 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.60 $1.38 $16.98 Above median -32% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Androscoggin, ME — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Androscoggin

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ME20260045-17904-hwy →