Highway Construction — Androscoggin, Maine
WD ME20260045-17904-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Androscoggin, Maine (construction type: highway) is $18.95/hr base + $3.23/hr fringe = $22.18/hr total package (WD ME20260045-17904-hwy, Rev. 1).
Scroll down for all 25 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $18.95 | $3.23 | $22.18 Above median -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $19.27 | $1.13 | $20.40 -21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $25.21 | $5.63 | $30.84 -5% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $15.53 | $2.04 | $17.57 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| INSTALLER - GUARDRAIL | $19.98 | $2.55 | $22.53 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $21.85 | $0.00 | $21.85 -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $22.33 | $4.50 | $26.83 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $16.71 | $0.63 | $17.34 Above median -21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $14.65 | $1.64 | $16.29 Above median -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: EPOXY INJECTOR | $13.43 | $1.15 | $14.58 -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: WHEELMAN | $22.87 | $3.79 | $26.66 Top 10% +22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.09 | $3.20 | $23.29 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.03 | $3.43 | $24.46 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $19.52 | $0.00 | $19.52 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $21.71 | $5.67 | $27.38 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $27.40 | $8.13 | $35.53 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $19.52 | $3.19 | $22.71 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $24.69 | $8.18 | $32.87 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MILLING MACHINE | $28.51 | $5.44 | $33.95 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $20.86 | $3.73 | $24.59 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $14.74 | $1.29 | $16.03 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER ASPHALT | $19.14 | $3.43 | $22.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: FLAGGER | $9.06 | $0.00 | $9.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.02 | $5.37 | $22.39 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $15.60 | $1.38 | $16.98 Above median -32% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Androscoggin, ME — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Androscoggin
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Androscoggin, Maine.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.