Building Construction — Androscoggin, Maine

WD ME20260004-17904-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Androscoggin, Maine (construction type: building) is $33.00/hr base + $11.13/hr fringe = $44.13/hr total package (WD ME20260004-17904-bld, Rev. 1).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: ME20260004-17904-bld
Revision: 1
Construction Type: building
State: Maine (ME)
County: Androscoggin
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference ME20260004View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $33.00 $11.13 $44.13 +37% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $30.56 $19.96 $50.52 +78% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.00 $0.00 $20.00 -23% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.74 $21.14 $59.88 +84% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANK $74.17 $38.44 $112.61 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $33.65 $26.27 $59.92 +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.66 $11.38 $30.04 Above median +37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $22.15 $19.72 $41.87 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $23.83 $4.21 $28.04 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER $43.76 $25.44 $69.20 Above median +133% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $40.00 $24.71 $64.71 Above median +117% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Androscoggin, ME — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Androscoggin

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ME20260004-17904-bld →