Highway Construction — St Charles, Louisiana

WD LA20260011-15360-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in St Charles, Louisiana (construction type: highway) is $32.59/hr base + $10.52/hr fringe = $43.11/hr total package (WD LA20260011-15360-hwy, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: LA20260011-15360-hwy
Revision: 1
Construction Type: highway
State: Louisiana (LA)
County: St Charles
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference LA20260011View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $32.59 $10.52 $43.11 +81% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.03 $4.24 $24.27 -2% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $17.49 $0.00 $17.49 -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $22.28 $4.81 $27.09 Above median +40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.96 $4.81 $23.77 Above median +23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.51 $1.14 $10.65 -45% vs market $0.00 $0.00 $0.00 $0.00
MECHANIC $25.40 $8.05 $33.45 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ASPHALT PAVER $17.20 $4.97 $22.17 Top 10% -7% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR/TRACKHOE $16.85 $4.91 $21.76 Top 10% -9% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BROOM/SWEEPER $15.17 $5.15 $20.32 Top 10% -15% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $16.40 $0.00 $16.40 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANE $25.35 $0.00 $25.35 Top 10% +6% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GRADER/BLADE $15.88 $0.00 $15.88 Bottom 10% -33% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MILLING MACHINE $16.63 $2.14 $18.77 Top 10% -21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ROLLER $14.74 $4.23 $18.97 Top 10% -21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ROLLER $12.59 $4.37 $16.96 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: TRENCHER $14.38 $0.00 $14.38 Top 10% -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: DUMP TRUCK $12.93 $0.18 $13.11 Above median -44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: WATER TRUCK $13.79 $0.00 $13.79 Top 10% -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the St Charles, LA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in St Charles

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for LA20260011-15360-hwy →