Building Construction — St Charles, Louisiana

WD LA20260052-15360-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in St Charles, Louisiana (construction type: building) is $32.66/hr base + $9.86/hr fringe = $42.52/hr total package (WD LA20260052-15360-bld, Rev. 2).

Scroll down for all 23 trade classifications covered by this determination.

WD Number: LA20260052-15360-bld
Revision: 2
Construction Type: building
State: Louisiana (LA)
County: St Charles
Effective: May 17, 2026
Trades covered: 23
Official source: SAM.gov reference LA20260052View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $32.66 $9.86 $42.52 +77% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $18.88 $0.00 $18.88 -17% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $15.00 $0.00 $15.00 -37% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION, AND FORM WORK $19.25 $2.73 $21.98 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $30.47 $7.97 $38.44 Above median +56% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $18.35 $4.33 $22.68 Above median +28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.00 $16.66 $52.66 +84% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANK $51.11 $38.44 $89.55 Above median $0.00 $0.00 $0.00 $0.00
GLAZIER $25.44 $12.20 $37.64 +76% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $34.75 $13.86 $48.61 +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.28 $0.00 $13.28 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.39 $0.00 $12.39 -36% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.03 $0.00 $21.03 Above median $0.00 $0.00 $0.00 $0.00
PAINTER, EXCLUDES DRYWALL FINISHING/TAPING $18.95 $8.91 $27.86 Top 10% +33% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $18.63 $3.43 $22.06 +5% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $34.87 $17.79 $52.66 +69% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $33.30 $14.98 $48.28 Above median +55% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE CRANE PREMIUMS: 50-150 TONS $1.75 OVER 150 TONS $2.25 $23.46 $8.35 $31.81 Top 10% +33% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $26.71 $11.93 $38.64 +46% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 20.66 0.00 ROOFER $16.77 $5.66 $22.43 Top 10% -15% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $20.98 $5.46 $26.44 -15% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $20.00 $0.00 $20.00 -9% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.00 $0.00 $15.00 -36% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the St Charles, LA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in St Charles

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for LA20260052-15360-bld →