Heavy Construction — Greenup, Kentucky

WD KY20260083-17000-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Greenup, Kentucky (construction type: heavy) is $24.80/hr base + $8.76/hr fringe = $33.56/hr total package (WD KY20260083-17000-hvy, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: KY20260083-17000-hvy
Revision: 1
Construction Type: heavy
State: Kentucky (KY)
County: Greenup
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference KY20260083View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $24.80 $8.76 $33.56 +37% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.96 $22.44 $63.40 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $37.77 $23.90 $61.67 +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $36.17 $25.80 $61.97 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $22.17 $9.64 $31.81 Above median +46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE FINISHING $25.75 $8.60 $34.35 Above median +58% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW & PIPELAYER $35.69 $14.45 $50.14 +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE WORKER $26.87 $19.66 $46.53 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $35.52 $14.45 $49.97 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $26.68 $13.00 $39.68 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $28.60 $11.83 $40.43 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $24.34 $13.00 $37.34 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRENCHER $26.27 $12.37 $38.64 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; DRILL; PUMPCRETE; ROLLER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER SHAL $41.55 $19.60 $61.15 +123% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 Backhoe/Excavator/Trackhoe; Bulldozer; Drill; Pumpcrete; Roller $41.55 $19.60 $61.15 +123% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 CRANE; FORKLIFT OPERATORS ON CRANES WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $0.75 ABOVE GROUP 1. AL $41.55 $19.60 $61.15 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 Crane Forklift $41.55 $19.60 $61.15 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP; ROLLER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER SHALL RECEIVE $ $38.69 $19.60 $58.29 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH $38.37 $19.60 $57.97 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.82 $3.26 $21.08 Above median -21% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Greenup, KY — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Greenup

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KY20260083-17000-hvy →