Building Construction — Greenup, Kentucky

WD KY20260101-17000-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Greenup, Kentucky (construction type: building) is $35.23/hr base + $23.04/hr fringe = $58.27/hr total package (WD KY20260101-17000-bld, Rev. 2).

Scroll down for all 36 trade classifications covered by this determination.

WD Number: KY20260101-17000-bld
Revision: 2
Construction Type: building
State: Kentucky (KY)
County: Greenup
Effective: May 17, 2026
Trades covered: 36
Official source: SAM.gov reference KY20260101View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $35.23 $23.04 $58.27 +167% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.85 $28.44 $72.29 +105% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $35.00 $17.13 $52.13 +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: TILE FINISHER $35.40 $17.66 $53.06 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: TILE SETTER $35.11 $18.26 $53.37 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $37.04 $26.57 $63.61 Above median +160% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $33.60 $16.05 $49.65 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.15 $29.35 $70.50 Above median +147% vs market $0.00 $0.00 $0.00 $0.00
INDUSTRIAL: BRICKLAYER - REFRACTORY BRICK REPLACEMENT $41.05 $21.79 $62.84 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $28.38 $16.89 $45.27 Above median +37% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $25.62 $18.01 $43.63 Above median +32% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $37.77 $23.90 $61.67 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CARPENTER TENDER $30.95 $21.83 $52.78 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $23.27 $13.67 $36.94 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FIRE WATCH $31.20 $23.18 $54.38 Bottom 10% +149% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $21.86 $9.31 $31.17 Above median +43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $31.20 $23.18 $54.38 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $20.36 $9.90 $30.26 Above median +39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: POWER TOOL OPERATOR $31.35 $23.18 $54.53 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $24.66 $10.81 $35.47 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $19.69 $4.71 $24.40 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $22.52 $4.00 $26.52 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $23.60 $12.65 $36.25 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $31.96 $23.95 $55.91 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $22.81 $11.87 $34.68 +58% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $42.75 $25.76 $68.51 Above median +129% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $41.00 $21.66 $62.66 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $40.65 $19.60 $60.25 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $34.99 $19.60 $54.59 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE $41.98 $19.60 $61.58 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $41.98 $19.60 $61.58 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $40.65 $19.60 $60.25 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $34.38 $19.94 $54.32 Above median +137% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $33.53 $26.71 $60.24 Above median +155% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $44.15 $26.08 $70.23 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $24.35 $14.59 $38.94 Top 10% +46% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Greenup, KY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Greenup

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KY20260101-17000-bld →