Building Construction — Doniphan, Kansas

WD KS20260047-15693-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL) in Doniphan, Kansas (construction type: building) is $45.60/hr base + $35.47/hr fringe = $81.07/hr total package (WD KS20260047-15693-bld, Rev. 1).

Scroll down for all 28 trade classifications covered by this determination.

WD Number: KS20260047-15693-bld
Revision: 1
Construction Type: building
State: Kansas (KS)
County: Doniphan
Effective: May 17, 2026
Trades covered: 28
Official source: SAM.gov reference KS20260047View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL) $45.60 $35.47 $81.07 Top 10% +261% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $43.57 $23.02 $66.59 Above median +153% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $39.59 $22.40 $61.99 Above median +150% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.49 $8.39 $31.88 Above median +31% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $30.62 $14.45 $45.07 +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $31.60 $16.95 $48.55 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $28.91 $15.25 $44.16 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $17.86 $1.01 $18.87 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $26.69 $7.01 $33.70 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $33.12 $13.96 $47.08 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $33.19 $14.16 $47.35 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $34.83 $14.16 $48.99 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $31.05 $13.26 $44.31 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $30.35 $12.04 $42.39 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $33.78 $13.64 $47.42 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $36.18 $19.97 $56.15 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $55.56 $25.80 $81.36 Above median +169% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $33.22 $15.43 $48.65 Above median +61% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER $45.48 $22.42 $67.90 Above median +179% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $39.93 $22.42 $62.35 Above median +156% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $45.48 $22.42 $67.90 Above median +179% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $38.45 $22.29 $60.74 Above median +167% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $52.18 $27.15 $79.33 Above median +224% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $20.74 $1.46 $22.20 -17% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $42.73 $18.39 $61.12 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $25.50 $10.38 $35.88 Above median +31% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $39.89 $15.85 $55.74 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $39.89 $15.85 $55.74 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Doniphan, KS — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Doniphan

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KS20260047-15693-bld →