Davis-Bacon Wage Determinations — Doniphan, Kansas

Doniphan has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Doniphan, Kansas cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: KS20260047-15693-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: KS20260004-15693-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway Active
WD: KS20260133-15693-hwy Rev. 1
Effective: May 17, 2026
View trade rates →
residential Active
WD: KS20260001-15693-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Doniphan

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 PIPEFITTER building $55.56 $25.80 $81.36 WD →
2 ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL) building $45.60 $35.47 $81.07 WD →
3 SHEET METAL WORKER building $52.18 $27.15 $79.33 WD →
4 IRONWORKER, STRUCTURAL highway $39.00 $34.25 $73.25 WD →
5 IRONWORKER heavy $39.00 $34.25 $73.25 WD →
6 POWER EQUIPMENT OPERATOR: Paver building $45.48 $22.42 $67.90 WD →
7 POWER EQUIPMENT OPERATOR: Bobcat/Skid Steer/Skid Loader building $45.48 $22.42 $67.90 WD →
8 POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER building $45.48 $22.42 $67.90 WD →
9 POWER EQUIPMENT OPERATOR: PAVER building $45.48 $22.42 $67.90 WD →
10 BRICKLAYER building $43.57 $23.02 $66.59 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →