Residential Construction — Jackson, Indiana

WD IN20260032-16784-res · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Jackson, Indiana (construction type: residential) is $18.36/hr base + $7.46/hr fringe = $25.82/hr total package (WD IN20260032-16784-res, Rev. 2).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: IN20260032-16784-res
Revision: 2
Construction Type: residential
State: Indiana (IN)
County: Jackson
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference IN20260032View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $18.36 $7.46 $25.82 -11% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.78 $0.00 $17.78 -38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $17.48 $3.40 $20.88 -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.93 $0.00 $13.93 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $14.00 $0.00 $14.00 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $37.15 $23.48 $60.63 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $23.13 $16.00 $39.13 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $27.35 $13.44 $40.79 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY $18.29 $7.43 $25.72 Top 10% +7% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER $18.29 $7.43 $25.72 Top 10% +7% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.29 $7.43 $25.72 +7% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $34.01 $14.00 $48.01 Above median +55% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR $33.65 $16.40 $50.05 Bottom 10% +44% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $38.60 $28.83 $67.43 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER: ASPHALT, AGGREGATE, AND CONCRETE $33.65 $16.40 $50.05 +44% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $43.00 $21.41 $64.41 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $43.44 $27.89 $71.33 Above median +149% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $26.20 $10.74 $36.94 +29% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Jackson, IN — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Jackson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IN20260032-16784-res →