Building Construction — Jackson, Indiana

WD IN20260007-16784-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Jackson, Indiana (construction type: building) is $35.21/hr base + $18.19/hr fringe = $53.40/hr total package (WD IN20260007-16784-bld, Rev. 1).

Scroll down for all 10 trade classifications covered by this determination.

WD Number: IN20260007-16784-bld
Revision: 1
Construction Type: building
State: Indiana (IN)
County: Jackson
Effective: May 17, 2026
Trades covered: 10
Official source: SAM.gov reference IN20260007View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $35.21 $18.19 $53.40 +54% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $32.43 $25.78 $58.21 Above median +100% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $30.02 $18.20 $48.22 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $12.50 $0.00 $12.50 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $7.50 $0.00 $7.50 Bottom 10% -79% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $28.38 $18.55 $46.93 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $32.02 $16.86 $48.88 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER) $21.12 $0.00 $21.12 -32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BACKHOE $39.50 $19.28 $58.78 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.91 $25.22 $66.13 Above median +131% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Jackson, IN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Jackson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IN20260007-16784-bld →