Residential Construction — Montgomery, Illinois

WD IL20260049-16766-res · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BLACK TOP PLANT OILER in Montgomery, Illinois (construction type: residential) is $41.95/hr base + $34.95/hr fringe = $76.90/hr total package (WD IL20260049-16766-res, Rev. 2).

Scroll down for all 36 trade classifications covered by this determination.

WD Number: IL20260049-16766-res
Revision: 2
Construction Type: residential
State: Illinois (IL)
County: Montgomery
Effective: May 17, 2026
Trades covered: 36
Official source: SAM.gov reference IL20260049View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BLACK TOP PLANT OILER $41.95 $34.95 $76.90 Bottom 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.13 $22.05 $55.18 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER & SOFT FLOOR LAYER $30.02 $28.60 $58.62 Top 10% +60% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (MONTGOMERY COUNTY) $28.05 $16.73 $44.78 -3% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (MONTGOMERY COUNTY) $24.83 $17.12 $41.95 -9% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (MONTGOMERY COUNTY) $35.73 $19.66 $55.39 +20% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $39.77 $22.73 $62.50 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (MONTGOMERY COUNTY) $36.20 $31.35 $67.55 +39% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (MONTGOMERY COUNTY) $41.65 $31.18 $72.83 +50% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 GENERAL LABORERS. (MONTGOMERY COUNTY) $32.41 $32.32 $64.73 +107% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MONTGOMERY COUNTY) $32.91 $32.32 $65.23 +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 DYNAMITE AND POWDER MAN (MONTGOMERY COUNTY) $33.91 $32.32 $66.23 +112% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 1 GENERAL LABORER (MONTGOMERY COUNTY) $32.41 $32.32 $64.73 +107% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MONTGOMERY COUNTY) $32.91 $32.32 $65.23 +109% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GROUP 3 DYNAMITE MAN (MONTGOMERY COUNTY) $33.91 $32.32 $66.23 +112% vs market $0.00 $0.00 $0.00 $0.00
PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM $31.39 $21.58 $52.97 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER (MONTGOMERY COUNTY) FOOTNOTE: A. 4 HOURS PAID HOLIDAYFOR CHRISTMAS EVE IF HOLIDAY FALLS ON MONDAY THROUGH FRIDAY $51.61 $21.45 $73.06 +58% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER (MONTGOMERY COUNTY) $37.88 $25.71 $63.59 +37% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC $42.95 $34.95 $77.90 Bottom 10% +67% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT $43.95 $34.95 $78.90 Bottom 10% +69% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT $40.95 $34.95 $75.90 Bottom 10% +63% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS $39.82 $34.95 $74.77 Bottom 10% +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON O $35.34 $34.95 $70.29 Bottom 10% +51% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 05 OILERS $42.95 $34.95 $77.90 Bottom 10% +67% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT $43.50 $34.95 $78.45 Bottom 10% +68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 07 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT $43.80 $34.95 $78.75 Bottom 10% +69% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 08 OPERATORS ON EQUIPMENT WITH BOOMNS, INCLUDING JIBS, 200 FT AND OVER; TOWER CRANES, AND WHIRLEY CRANES $44.10 $34.95 $79.05 Bottom 10% +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER $44.75 $34.95 $79.70 Bottom 10% +71% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $36.00 $26.36 $62.36 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $34.27 $17.44 $51.71 +15% vs market $0.00 $0.00 $0.00 $0.00
THE CONTRACTOR OR REQUIRED BY THE OWNER $45.25 $34.95 $80.20 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE U $45.35 $25.72 $71.07 +147% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3- 2, 3 OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; ME $46.25 $25.72 $71.97 +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: LOW BOY AND OIL DISTRIBUTORS $46.60 $25.72 $72.32 +152% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK $47.71 $25.72 $73.43 +155% vs market $0.00 $0.00 $0.00 $0.00
WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCK $45.93 $25.72 $71.65 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Montgomery, IL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Montgomery

Compliance Notes

Full Davis-Bacon compliance guide →