Highway Construction — Valley, Idaho

WD ID20260086-17231-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Valley, Idaho (construction type: highway) is $26.57/hr base + $8.10/hr fringe = $34.67/hr total package (WD ID20260086-17231-hwy, Rev. 1).

Scroll down for all 30 trade classifications covered by this determination.

WD Number: ID20260086-17231-hwy
Revision: 1
Construction Type: highway
State: Idaho (ID)
County: Valley
Effective: May 17, 2026
Trades covered: 30
Official source: SAM.gov reference ID20260086View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $26.57 $8.10 $34.67 +49% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $26.83 $11.94 $38.77 +33% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $23.80 $6.67 $30.47 Above median $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $23.09 $10.44 $33.53 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $23.88 $11.05 $34.93 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $23.98 $11.05 $35.03 +61% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $23.41 $10.78 $34.19 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $23.88 $11.05 $34.93 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE $40.89 $18.64 $59.53 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $26.20 $9.97 $36.17 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $25.35 $11.55 $36.90 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $23.93 $9.09 $33.02 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $25.94 $10.36 $36.30 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $26.04 $10.28 $36.32 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRUSHER $25.06 $9.23 $34.29 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $26.00 $10.30 $36.30 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: HYDROSEEDER $24.76 $11.51 $36.27 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $25.15 $9.83 $34.98 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $25.40 $8.63 $34.03 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $25.66 $9.23 $34.89 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $25.63 $10.33 $35.96 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $22.24 $8.57 $30.81 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $25.24 $10.42 $35.66 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROTOMILL $27.06 $12.65 $39.71 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $24.07 $9.63 $33.70 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $22.66 $10.90 $33.56 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $21.80 $13.95 $35.75 Top 10% +40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $22.12 $13.20 $35.32 Top 10% +38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK $22.54 $12.35 $34.89 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $23.99 $11.12 $35.11 Top 10% +37% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Valley, ID — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Valley

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ID20260086-17231-hwy →