Heavy Construction — Valley, Idaho

WD ID20260063-17231-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 200 FT $.30 OVER SCALE OVER 200 FT POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, CRANES, DRILLING, FRONT END LOADER, OILER, SCRAPER ZONE PAY: ZON in Valley, Idaho (construction type: heavy) is $36.98/hr base + $16.10/hr fringe = $53.08/hr total package (WD ID20260063-17231-hvy, Rev. 1).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: ID20260063-17231-hvy
Revision: 1
Construction Type: heavy
State: Idaho (ID)
County: Valley
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference ID20260063View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
200 FT $.30 OVER SCALE OVER 200 FT POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, CRANES, DRILLING, FRONT END LOADER, OILER, SCRAPER ZONE PAY: ZON $36.98 $16.10 $53.08 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $25.41 $9.98 $35.39 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.25 $12.31 $35.56 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.25 $18.84 $61.09 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $27.22 $16.70 $43.92 Above median +47% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $33.37 $22.98 $56.35 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $26.08 $7.70 $33.78 Above median +55% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 FLAGGER $33.63 $16.50 $50.13 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR $33.83 $16.50 $50.33 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.67 $7.26 $24.93 Above median +14% vs market $0.00 $0.00 $0.00 $0.00
MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE $36.81 $16.10 $52.91 Bottom 10% $0.00 $0.00 $0.00 $0.00
MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE $38.06 $16.10 $54.16 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $26.44 $8.95 $35.39 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $20.97 $0.00 $20.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $26.44 $8.95 $35.39 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE BATCH PLANT $24.94 $11.96 $36.90 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $21.20 $0.00 $21.20 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PE $36.33 $16.10 $52.43 Top 10% +84% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $36.64 $16.10 $52.74 +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 70 CRANES, DRILL, GRADER, FRONT END LOADER, HEAVY DUTY MECHANIC, SCRAPERS, TOWER CRANE ZONE PAY: ZONE 1 0 - 30 MILES $27.35 $16.10 $43.45 +53% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 SCRAPER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/P $37.58 $16.10 $53.68 +89% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5A DUMP $35.60 $17.00 $52.60 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5B DUMP $35.78 $17.00 $52.78 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5C DUMP $36.01 $17.00 $53.01 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5D DUMP $36.12 $17.00 $53.12 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5E DUMP $36.75 $17.00 $53.75 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5F DUMP $37.19 $17.00 $54.19 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $21.00 $12.10 $33.10 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $24.70 $12.10 $36.80 Top 10% +44% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Valley, ID — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Valley

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ID20260063-17231-hvy →