Highway Construction — Teton, Idaho

WD ID20260087-17229-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Teton, Idaho (construction type: highway) is $26.57/hr base + $8.10/hr fringe = $34.67/hr total package (WD ID20260087-17229-hwy, Rev. 1).

Scroll down for all 32 trade classifications covered by this determination.

WD Number: ID20260087-17229-hwy
Revision: 1
Construction Type: highway
State: Idaho (ID)
County: Teton
Effective: May 17, 2026
Trades covered: 32
Official source: SAM.gov reference ID20260087View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $26.57 $8.10 $34.67 +49% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $25.00 $10.93 $35.93 +23% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $24.80 $6.91 $31.71 Above median $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $23.37 $10.50 $33.87 Above median +55% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $22.68 $10.90 $33.58 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $23.98 $11.05 $35.03 +61% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $23.52 $11.05 $34.57 Above median +58% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $23.42 $10.90 $34.32 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE $40.89 $18.64 $59.53 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $25.74 $10.07 $35.81 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $25.35 $11.55 $36.90 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $24.95 $10.18 $35.13 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $26.19 $9.60 $35.79 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $26.22 $10.00 $36.22 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRUSHER $25.06 $9.23 $34.29 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $25.96 $10.00 $35.96 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: HYDROSEEDER $24.76 $11.51 $36.27 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $26.22 $9.98 $36.20 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $26.91 $10.22 $37.13 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $25.66 $9.23 $34.89 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $26.13 $10.40 $36.53 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $22.24 $8.57 $30.81 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $25.54 $10.62 $36.16 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROTOMILL $25.84 $10.63 $36.47 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $25.42 $9.93 $35.35 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $22.68 $10.90 $33.58 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $22.66 $10.90 $33.56 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DISTRIBUTOR TRUCK $21.66 $13.04 $34.70 Top 10% +36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $21.86 $13.18 $35.04 Top 10% +37% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $21.53 $12.96 $34.49 Top 10% +35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK $22.54 $12.35 $34.89 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $21.35 $13.33 $34.68 Above median +35% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Teton, ID — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Teton

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ID20260087-17229-hwy →