Heavy Construction — Gooding, Idaho
WD ID20260050-17218-hvy · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE in Gooding, Idaho (construction type: heavy) is $37.58/hr base + $16.10/hr fringe = $53.68/hr total package (WD ID20260050-17218-hvy, Rev. 2).
Scroll down for all 25 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE | $37.58 | $16.10 | $53.68 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $25.27 | $9.10 | $34.37 +47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $28.00 | $0.00 | $28.00 Above median +20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.16 | $5.67 | $22.83 -2% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.00 | $18.74 | $58.74 +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $27.22 | $16.70 | $43.92 Above median +47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $21.08 | $9.94 | $31.02 Above median +42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUP 1 FLAGGER | $33.63 | $16.50 | $50.13 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR | $33.83 | $16.50 | $50.33 Top 10% +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $16.39 | $0.00 | $16.39 Above median -25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE | $36.98 | $16.10 | $53.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE | $38.06 | $16.10 | $54.16 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.06 | $0.00 | $21.06 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.00 | $0.00 | $17.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $27.59 | $9.60 | $37.19 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $21.98 | $0.00 | $21.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $25.17 | $9.44 | $34.61 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $18.91 | $0.00 | $18.91 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $16.88 | $0.00 | $16.88 -24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PE | $36.33 | $16.10 | $52.43 Top 10% +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 7: DRILL, HEAVY DUTY MECHANIC, SCRAPERS ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE | $37.35 | $16.10 | $53.45 Top 10% +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $18.84 | $0.00 | $18.84 Above median -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.00 | $12.10 | $33.10 Top 10% +29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $23.89 | $9.52 | $33.41 Above median +31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Gooding, ID — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Gooding
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Gooding, Idaho.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.