Building Construction — Gooding, Idaho

WD ID20260022-17218-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Gooding, Idaho (construction type: building) is $30.00/hr base + $17.78/hr fringe = $47.78/hr total package (WD ID20260022-17218-bld, Rev. 2).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: ID20260022-17218-bld
Revision: 2
Construction Type: building
State: Idaho (ID)
County: Gooding
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference ID20260022View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $30.00 $17.78 $47.78 +58% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $21.44 $0.00 $21.44 -8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.76 $2.80 $17.56 -25% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.00 $18.74 $58.74 +101% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC: DUCT INSTALLATION $23.63 $6.63 $30.26 Top 10% +19% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $33.37 $22.98 $56.35 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.82 $0.00 $14.82 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.26 $0.00 $14.26 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TAMPER $15.00 $5.00 $20.00 Bottom 10% -8% vs market $0.00 $0.00 $0.00 $0.00
LABORER:MASON TENDER-CEMENT/CONCRETE $33.93 $16.50 $50.43 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.96 $4.42 $23.38 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $27.29 $10.53 $37.82 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $16.12 $0.00 $16.12 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $39.90 $18.67 $58.57 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $29.02 $19.90 $48.92 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.20 $23.59 $62.79 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.82 $2.18 $20.00 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3 WATER TRUCK $35.00 $17.00 $52.00 +103% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Gooding, ID — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Gooding

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ID20260022-17218-bld →