Heavy Construction — Bonner, Idaho

WD ID20260040-17234-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for $2.00 in Bonner, Idaho (construction type: heavy) is $27.51/hr base + $15.95/hr fringe = $43.46/hr total package (WD ID20260040-17234-hvy, Rev. 1).

Scroll down for all 24 trade classifications covered by this determination.

WD Number: ID20260040-17234-hvy
Revision: 1
Construction Type: heavy
State: Idaho (ID)
County: Bonner
Effective: May 17, 2026
Trades covered: 24
Official source: SAM.gov reference ID20260040View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
$2.00 $27.51 $15.95 $43.46 Above median $0.00 $0.00 $0.00 $0.00
CARPENTER $38.87 $17.84 $56.71 +143% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $29.92 $5.20 $35.12 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $49.55 $19.09 $68.64 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $43.40 $30.27 $73.67 Top 10% +146% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON $26.28 $12.15 $38.43 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 GENERAL OR COMMON ZONE DIFFERENTIAL: ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2 $32.15 $16.30 $48.45 +122% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $22.13 $11.13 $33.26 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.67 $7.26 $24.93 Above median +14% vs market $0.00 $0.00 $0.00 $0.00
OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE $40.89 $18.64 $59.53 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $20.97 $0.00 $20.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE BATCH PLANT $24.94 $11.96 $36.90 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $21.20 $0.00 $21.20 $0.00 $0.00 $0.00 $0.00
PLUMBER $37.71 $23.44 $61.15 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 $28.44 $15.95 $44.39 +56% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER $28.60 $15.95 $44.55 +57% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE, CRANES, DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE $28.76 $15.95 $44.71 +57% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE, CRANE, BULLDOZER, GRADER/BLADE, FRONT-END LOADER, PAVER, SCRAPERS ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, L $29.04 $15.95 $44.99 +58% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE, CRANES, HEAVY DUTY MECHANIC, FRONT END LOADER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 $29.31 $15.95 $45.26 +59% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES, FRONT END LOADER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES $30.41 $15.95 $46.36 +63% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $37.02 $20.93 $57.95 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $36.58 $20.93 $57.51 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $21.00 $12.10 $33.10 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $24.48 $11.67 $36.15 Top 10% +41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Bonner, ID — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.