Residential Construction — Gwinnett, Georgia

WD GA20260049-16591-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 12.00 0.00 BRICKLAYER in Gwinnett, Georgia (construction type: residential) is $13.83/hr base + $0.00/hr fringe = $13.83/hr total package (WD GA20260049-16591-res, Rev. 1).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: GA20260049-16591-res
Revision: 1
Construction Type: residential
State: Georgia (GA)
County: Gwinnett
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference GA20260049View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 12.00 0.00 BRICKLAYER $13.83 $0.00 $13.83 Top 10% -43% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.02 $3.52 $16.54 -27% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $13.45 $0.00 $13.45 $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $11.42 $0.00 $11.42 -56% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS $11.57 $0.00 $11.57 Top 10% -59% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $8.50 $0.16 $8.66 Bottom 10% $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $11.14 $0.00 $11.14 -58% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.19 $0.00 $10.19 -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER $8.00 $0.00 $8.00 Above median -56% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: BACKHOE, BULLDOZER, COMPACTOR, AND LOADER $30.17 $17.70 $47.87 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: BACKHOE, BULLDOZER, COMPACTOR, AND LOADER $28.32 $13.45 $41.77 Bottom 10% +87% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $8.96 $0.00 $8.96 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING $10.57 $0.00 $10.57 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $10.95 $0.00 $10.95 Bottom 10% -60% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $11.50 $0.00 $11.50 -50% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION..$ 25.49 11.73 SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION $32.60 $15.52 $48.12 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $11.07 $0.00 $11.07 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $12.13 $0.00 $12.13 -55% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Gwinnett, GA — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Gwinnett

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for GA20260049-16591-res →