Highway Construction — Gwinnett, Georgia
WD GA20260003-16591-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER in Gwinnett, Georgia (construction type: highway) is $32.68/hr base + $0.00/hr fringe = $32.68/hr total package (WD GA20260003-16591-hwy, Rev. 1).
Scroll down for all 17 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $32.68 | $0.00 | $32.68 +35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $30.37 | $0.00 | $30.37 +34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $17.23 | $2.23 | $19.46 Above median +7% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $18.70 | $0.00 | $18.70 Above median +2% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $22.42 | $0.00 | $22.42 Above median +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.53 | $3.63 | $27.16 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $24.68 | $2.59 | $27.27 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $39.31 | $0.00 | $39.31 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $26.18 | $4.28 | $30.46 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $22.37 | $1.40 | $23.77 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MILLING MACHINE | $29.67 | $6.29 | $35.96 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $23.62 | $4.10 | $27.72 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $18.89 | $3.99 | $22.88 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCREED | $21.00 | $4.22 | $25.22 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: FLAGGER | $14.80 | $2.76 | $17.56 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $22.21 | $3.58 | $25.79 Above median -5% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $25.43 | $4.00 | $29.43 Above median +8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Gwinnett, GA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Gwinnett
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Gwinnett, Georgia.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.